# US 6,728,987 B1 · Method of adjusting the vertical profile of a cable supported bridge

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 6,728,987 B1
- Document ID: US6728987B1
- Status: Granted
- Kind: B1
- Application number: 10/128,209
- Filed: 2002-04-23
- Granted: 2004-05-04
- Earliest claimed: 2002-04-23
- Assignees: CH2M Hill, Inc.
- Inventors: John David Hinman
- Web page: https://patentgrep.com/patent/US6728987B1

## CPC

- E01D 11/00: Suspension or cable-stayed bridges
- E01D 22/00: Methods or apparatus for repairing or strengthening existing bridges {(electrochemical desalination or re-alkalisation C04B41/00); Methods or apparatus for dismantling bridges}
- E01D: CONSTRUCTION OF BRIDGES, {ELEVATED ROADWAYS} OR VIADUCTS; ASSEMBLY OF BRIDGES (bridges extending between terminal buildings and aircraft for embarking or disembarking passengers B64F1/305; {tracks for special kinds of railways E01B25/00; culverts E01F5/005})

## Abstract

A method of modifying the vertical profile of a cable supported bridge. The method consists of sequentially adjusting a lower end of a series of supporting cables downward relative to the bridge superstructure and sequentially adjusting an attachment structure associated with the lower end of each cable to maintain the distance each cable has been adjusted. The adjustments preferably proceeds according to a pre-specified plan known as an adjustment sequence. The preparation of an adjustment sequence according to the methods disclosed allows the modification of the vertical profile of the bridge superstructure to be completed without overstressing any bridge members, and with predictable results.

## Claims

### Claim 1

A method of modifying a vertical profile of a cable supported bridge having one or more towers supporting a plurality of cables attached to a bridge superstructure, each of the plurality of cables having a lower attachment point, an upper attachment point, and a distance between the lower attachment point and the upper attachment point, the method comprising:
a. sequentially adjusting, by applying a force, a position of the lower attachment point of each cable in a series of the plurality of cables by a specified linear distance per cable, such that the position of the lower attachment point is modified relative to the bridge superstructure; and
b. sequentially adjusting an attachment structure associated with the lower attachment point of each adjusted cable to maintain, when the force is removed, the linear distance the position of the lower attachment point of the cable has been modified relative to the bridge superstructure, whereby the distance between the upper attachment point and the lower attachment point remains substantially unchanged when the force is removed from each cable in the series of the plurality of cables.

### Claim 2 (depends on 1)

The method of claim 1 wherein in step a. the sequence of cable adjustment and the linear distance each cable is adjusted proceeds according to an adjustment sequence.

### Claim 3 (depends on 2)

The method of claim 2 wherein the adjustment sequence comprises sequentially adjusting each hanger cable from one end of a span to a second end of the span.

### Claim 4 (depends on 2)

The method of claim 2 wherein the adjustment sequence is repeated in multiple passes to obtain a desired adjustment greater than that obtainable in a single pass through the adjustment sequence.

### Claim 5 (depends on 1)

The method of claim 1 wherein stresses in structural members of the cable supported bridge are monitored during the physical implementation of the adjustment sequence.

### Claim 6 (depends on 1)

The method of claim 1 wherein in step b. the attachment structure is modified by adding a shim between a terminal portion of the cable and the attachment structure.

### Claim 7 (depends on 1)

The method of claim 1 wherein in step a. the cable being adjusted is pulled downward toward the centerline of the bridge superstructure by a jacking device.

### Claim 8

A method of modifying a vertical profile of a cable supported bridge having one or more towers supporting a plurality of cables attached to a bridge superstructure, comprising:
a. sequentially adjusting the lower end of each cable in a series of the plurality of cables by a specified linear distance per cable, relative to the bridge superstructure wherein the sequence of cable adjustment and the linear distance each cable is adjusted proceeds according to an adjustment sequence comprising:
a1. preparing a tentative adjustment sequence;
a2. preparing a non-linear mathematical model of the bridge;
a3. performing live and dead load analysis of the non-linear mathematical model of the bridge at various stages in the tentative adjustment sequence;
a4. determining if resulting deformations cause member forces to exceed allowable forces; and
b. sequentially adjusting an attachment structure associated with the lower end of each adjusted cable to maintain the linear distance the lower end of the cable has been adjusted relative to the bridge superstructure.

### Claim 9 (depends on 3, 8)

The method of claim 8 further comprising the following, if the analysis of claim 8, step a3. results in a determination that deformation has caused member forces to exceed allowable forces;
a5. preparing a modified tentative adjustment sequence based upon the results of the live and dead load analysis of claim 3, step a3.; and
a6. performing live and dead load analysis of the non-linear mathematical model of the bridge at various stages in the modified tentative adjustment sequence.

### Claim 10 (depends on 8)

The method of claim 8 further comprising verification of the bridge profile resulting from application of the tentative adjustment sequence to the mathematical model of the bridge.

### Claim 11 (depends on 9)

The method of claim 9 further comprising verification of the bridge profile resulting from application of the modified tentative adjustment sequence to the mathematical model of the bridge.

### Claim 12 (depends on 8)

The method of claim 8 wherein in step a2. the non-linear mathematical model of the bridge comprises:
a2a. a mathematical representation of structural elements that affect the structural load path;
a2b. a mathematical representation of large deflection effects; and
a2c. an active representation of the effect of a change in the length of individual cables.

### Claim 13 (depends on 8)

The method of claim 8 wherein the adjustment sequence comprises sequentially adjusting each hanger cable from one end of a span to a second end of the span.

### Claim 14 (depends on 8)

The method of claim 8 wherein the adjustment sequence is repeated in multiple passes to obtain a desired adjustment greater than that obtainable in a single pass through the adjustment sequence.

### Claim 15 (depends on 8)

The method of claim 8 wherein stresses in structural members of the cable supported bridge are monitored during the physical implementation of the adjustment sequence.

### Claim 16 (depends on 8)

The method of claim 8 wherein in step b. the attachment structure is modified by adding a shim between a terminal portion of the cable and the attachment structure.

### Claim 17 (depends on 8)

The method of claim 8 wherein in step a. the cable being adjusted is pulled downward toward the centerline of the bridge superstructure by a jacking device.

### Claim 18

A method of increasing a load supported by a cable supported bridge having one or more towers supporting a plurality of cables attached to a bridge superstructure, without permanently modifying a vertical profile of the superstructure of the bridge comprising:
a. temporarily modifying the vertical profile of the superstructure of the bridge by:
a1. sequentially adjusting the lower end of each cable in a series of the plurality of cables by a specified linear distance per cable, relative to the bridge superstructure;
a2. sequentially adjusting an attachment structure associated with the lower end of each adjusted cable to maintain the linear distance the lower end of the cable has been adjusted relative to the bridge superstructure; and
b. returning the bridge superstructure to the original vertical profile by increasing the load supported by the bridge.

### Claim 19 (depends on 18)

The method of claim 18 wherein in step a1. the sequence of cable adjustment and the linear distance each cable is adjusted proceeds according to an adjustment sequence.

### Claim 20 (depends on 19)

The method of claim 19 wherein the preparation of the adjustment sequence comprises:
a1a. preparing a tentative adjustment sequence;
a1b. preparing a non-linear mathematical model of the bridge;
a1c. performing live and dead load analysis of the non-linear mathematical model of the bridge at various stages in the tentative adjustment sequence; and
a1d. determining if resulting deformations cause member forces to exceed allowable forces.

### Claim 21 (depends on 19, 20)

The method of claim 19 further comprising the following if the analysis of claim 20, step a1c. results in a determination that deformation has caused member forces to exceed allowable forces;
a1e. preparing a modified tentative adjustment sequence based upon the results of the live and dead load analysis of claim 20, step a1c.; and
a1f. performing live and dead load analysis of the non-linear mathematical model of the bridge at various stages in the modified tentative adjustment sequence.

### Claim 22 (depends on 20)

The method of claim 20 further comprising verification of the bridge profile resulting from application of the tentative adjustment sequence to the mathematical model of the bridge.

### Claim 23 (depends on 21)

The method of claim 21 further comprising verification of the bridge profile resulting from application of the modified tentative adjustment sequence to the mathematical model of the bridge.

### Claim 24 (depends on 20)

The method of claim 20 wherein in step a1b. the non-linear mathematical model of the bridge comprises:
a1b1. determining a mathematical representation of structural elements that affect the structural load path;
a1b2. determining a mathematical representation of large deflection effects;
a1b3. determining an active representation of the effect of a change in the length of individual cables.

### Claim 25 (depends on 19)

The method of claim 19 wherein the adjustment sequence comprises sequentially adjusting each hanger cable from one end of a span to a second end of the span.

### Claim 26 (depends on 19)

The method of claim 19 wherein the adjustment sequence is repeated in multiple passes to obtain a desired adjustment greater than that obtainable in a single pass through the adjustment sequence.

### Claim 27 (depends on 18)

The method of claim 18 wherein stresses in structural members of the cable supported bridge are monitored during the physical implementation of the adjustment sequence.

### Claim 28 (depends on 18)

The method of claim 18 wherein in step a2. the attachment structure is modified by adding a shim between a terminal portion of the cable and the attachment structure.

### Claim 29 (depends on 18)

The method of claim 18 wherein in step a1. the cable being adjusted is pulled downward toward the centerline of the bridge superstructure by a jacking device.

### Claim 30

A cable supported bridge having a preexisting vertical profile and having one or more towers supporting a plurality of cables attached to a bridge superstructure each of the plurality of cables having a lower attachment point, the cable supported bridge modified by a process comprising:
a. sequentially adjusting a position of the lower eattachment point of each cable in a series of the plurality of cables, by a specified linear distance per cable such that the position of the lower attachment point is modified relative to the bridge superstructure; and
b. sequentially adjusting an attachment structure associated with the lower end attachment point of each adjusted cable to maintain the linear distance the lower attachment point of the cable has been adjusted relative to the bridge superstructure.