# US 6,726,748 B2 · Method of converting a downflow/upflow wet flue gas desulfurization (WFGD) system to an upflow single-loop WFGD system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 6,726,748 B2
- Document ID: US6726748B2
- Status: Granted
- Kind: B2
- Application number: 10/196,597
- Filed: 2002-07-16
- Published: 2004-01-22
- Granted: 2004-04-27
- Earliest claimed: 2002-07-16
- Assignees: The Babcock & Wilcox Company
- Inventors: Ronald L. Goode; Dennis W. Johnson; David W. Murphy; Robert B. Myers; John F. Sulek; David R. Burley; Paul J. Lieb
- Web page: https://patentgrep.com/patent/US6726748B2

## CPC

- B01D 53/18: Absorbing units; Liquid distributors therefor (B01D3/16, B01D3/26, B01D3/30 take precedence; packing elements B01J19/30, B01J19/32)
- B01D 53/1468: {Removing hydrogen sulfide}
- Y10T 29/49716: Converting
- B01D: SEPARATION (separating solids from solids by wet methods B03B, B03D; by pneumatic jigs or tables B03B; by other dry methods B07; magnetic or electrostatic separation of solid materials from solid materials or fluids, separation by high-voltage electric fields B03C; centrifuges, vortex apparatus B04; presses per se for squeezing-out liquid from liquid-containing material B30B9/02; treatment of water C02F, e.g. softening by ion-exchange C02F1/42; {arrangements of air intake cleaners in gas turbine plants F02C7/05} ; arrangements or mounting of filters in air-conditioning, air-humidification or ventilation F24F13/28)
- Y10T: TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION

## Abstract

A method of reducing the pressure drop in a downflow/upflow wet flue gas desulfurization (WFGD) system and of improving overall sulfur dioxide collection efficiency by converting the downflow/upflow WFGD system to an upflow single-loop WFGD system. The method includes the replacing of the downflow quencher and related duct work with a bypass for connecting the incoming flue gas duct with the upflow absorber, and the adding of a quenching zone in the absorber comprised of spray headers.

## Claims

### Claim 1

A method of reducing the pressure drop in a downflow/upflow flue gas desulfurization system by converting the downflow/upflow system to a single-loop flue gas desulfurization system, the method comprising the steps of:
providing a downflow/upflow flue gas desulfurization system having a downflow quencher and an upflow absorber, a lateral passageway located between the quencher and the absorber, means for supplying working fluid to the quencher, the absorber having a flue gas inlet, at least one sump located below the passageway and the absorber, duct work for conveying incoming flue gas to the passageway, the quencher being mounted in the duct work;
replacing the duct work with a bypass;
adding spray means above the absorber inlet; and
supplying working fluid to the spray means.

### Claim 2 (depends on 1)

The method as recited in claim 1, further including the step of extending the bypass to the absorber inlet.

### Claim 3 (depends on 2)

The method as recited in claim 2, wherein the lateral passageway has a roof, and further including the step of adding spray means between the passageway and the roof.

### Claim 4 (depends on 1)

The method as recited in claim 1, further including the step of replacing the passageway with the bypass.

### Claim 5 (depends on 1)

The method as recited in claim 1, further including the step of reducing the pressure drop by about 5 inches water gage.

### Claim 6 (depends on 1)

The method as recited in claim 1, wherein the step of supplying working fluid to the spray means includes redirecting the working fluid from the quencher to the spray means.

### Claim 7 (depends on 1)

The method as recited in claim 1, further including the step of placing a perforated tray below the spray means.

### Claim 8 (depends on 1)

The method as recited in claim 1, further including the step of providing the absorber with an awning over the flue gas inlet.

### Claim 9 (depends on 1)

The method as recited in claim 1, further including the step of mounting a standby quencher in the bypass.

### Claim 10 (depends on 1)

The method as recited in claim 1, further including the step of configuring the bypass with a lesser number of turns than the duct work.

### Claim 11 (depends on 1)

The method as recited in claim 1, further including the step of mounting guiding means in the bypass to promote the flow of flue gas therethrough.

### Claim 12 (depends on 1)

The method as recited in claim 1, further including the step of adding wall means at the inlet side of the absorber to accommodate the bypass.

### Claim 13 (depends on 10)

The method as recited in claim 10, further including the step of providing a sump overflow conduit through the wall means.

### Claim 14 (depends on 11)

The method as recited in claim 11, further including the step of placing the sump overflow conduit below the absorber inlet.

### Claim 15 (depends on 11)

The method as recited in claim 11, wherein partition means divide the sump into separate sections, and further including the step of providing an opening through the partition means.