A reservoir in payrock in analysed using finite element simulation. A reservoir engineer selects an appropriate model from a set of template models, each including a set of polygons in plan and layers in elevation. The polygons are defined in objects instantiated from classes by control points and the layers as depth values of control points. A pattern object sweeps rotationally about a wellbore in a wellbore polygon to define a pattern of elements, fewer in number with distance from the wellbore. A polygon object also sweeps linearly from a generator line in the direction of a base line. The generator and base lines correspond to polygon boundaries. Finite element simulation is performed with the model so derived.
A hydrocarbon reservoir analysis method comprising the steps of:
Dependencies are inferred from the claim text.
Drawings are temporarily unavailable. Open the PDF at USPTO
1. Field of the Invention
The invention relates to well testing of hydrocarbon reservoirs to determine economic viability.
The purpose of reservoir simulation is to determine as precisely as possible the extent (volume), nature, permeability, and porosity of the payrock.
The invention will be more clearly understood from the following description of some embodiments thereof, given by way of example only with reference to the accompanying drawings in which:
FIG. 1 is a high-level diagram showing a testing rig and a payrock;
FIG. 2 is a more detailed diagram showing a wellbore and its penetration into the payrock;
Referring to FIG. 1, the overall context for reservoir testing is illustrated. A testing rig 1 is erected over a payrock 2 containing a reservoir of a hydrocarbon (oil or gas). A wellbore 3 is drilled at an angle into the payrock, and alternative angles 4 and 5 are shown.
As shown in FIG. 2, the part of the payrock 2 surrounding the wellbore 3 is referred to as a damaged zone 10. Oil flows through the damaged zone 10 and the lining perforations into the wellbore 3 under the reservoir pressure. A valve 11 controls flow from the top of the wellbore 3 to a stock tank 12. A fault line 13 at one end of the payrock 2 is also illustrated in this diagram. Flow from the wellbore 3 to the stock tank 12 is denoted qv(t) and wellbore storage is denoted cVst. Various pressure sensors (not shown) are mounted within the wellbore 3 so that an actual pressure change (or curve) as a function of time can be measured.
Referring now to FIGS. 3, 4(a), and 4(b) a method 20 for reservoir testing and analysis is described. In a step 21 oil flow is measured using the pressure sensors. This step also involves laboratory analysis of oil samples drawn from the stock tank 12.
Testing the nature of borehole walls
Earth or rock drilling