Process for the implementation of civil engineering works, swimming pools and water tanks in particular, and means for its implementation
OwnerJoel Queirelinventor
Life of this patent
Estimating the term…
Loading patent…
OwnerJoel Queirelinventor
Estimating the term…
A process for the implementation of Civil Engineering works, swimming pools and water tanks in which, after digging in the grounds an excavation of suitable dimensions, are suitably set and wedged near the excavation walls, at a level on the bottom of the excavation and with the desired alignments, feet on which the elevated lower part of said panels will rest and be wedged, these feet having, on the outside of the work looking toward the grounds, a large opening above which are wedged chimneys that are fastened to the panels, a gully is set all around the outside of the work, above the chimneys and against the upper part of the panels, concrete or concrete mortar being poured into said gully to form the work upper clamping by filling up the chimneys and letting it overflow on the lower part of the panels, after having set inside the chimneys and in the upper gully the needed reinforcement irons, thus forming vertical pillars that will hold the work all around.
Process for the implementation of Civil Engineering works such as swimming pools and water tanks, installed on the grounds, that must comprise a wall made of a mechanically-resistant concrete filled in situ by means of panels made, at least in part, of two sheets of an appropriate plastic material, held together by bracing structures, forming at least in part a dead form structure and cooperating in the construction of the work, in an excavation, comprising:
Panel stabilizing feet for the implementation of Civil Engineering works such as swimming pools and water tanks, installed on the grounds, that must comprise a wall made of a mechanically-resistant concrete filled in situ by means of panels made, at least in part, of two sheets of an appropriate plastic material, held together by bracing structures, forming at least in part a dead form structure and cooperating in the construction of the work, dug in an excavation, comprising:
Panels for the implementation of Civil Engineering works such as swimming pools and water tanks, installed on the grounds, that must comprise a wall made of a mechanically-resistant concrete filled in situ by means of panels made, at least in part, of two sheets of an appropriate plastic material, held together by bracing structures, forming at least in part a dead form structure and cooperating in the construction of the work, dug in an excavation, comprising:
Panels for the implementation of Civil Engineering works such as swimming pools and water tanks, installed on the grounds, that must comprise a wall made of a mechanically-resistant concrete filled in situ by means of panels made, at least in part, of two sheets of an appropriate plastic material, held together by bracing structures, forming at least in part a dead form structure and cooperating in the construction of the work, dug in an excavation, comprising:
Dependencies are inferred from the claim text.