Multi-train installation for the production of cement clinker from raw meal
AssigneeKHD Humboldt Wedag GmbH
InventorsCarsten Eckert, Stefan Köllen, Hubert Ramesohl, Matthias Mersmann
Life of this patent
Estimating the term…
Loading patent…
AssigneeKHD Humboldt Wedag GmbH
InventorsCarsten Eckert, Stefan Köllen, Hubert Ramesohl, Matthias Mersmann
Estimating the term…
A dual-train or multi-train installation for the production of cement clinker from raw meal includes several cyclone suspension heat exchanger trains which provide substantially equal gas and meal loads of the following gas-solid suspensions through use of a vortex homogenization chamber (29), having an inlet opening (30) for the gas-solid suspension and having at least two outlets to a pair of pipes (28, 31) for the discharge of the thoroughly blended homogenized gas-solid suspension substreams. The vortex homogenization chamber (29) is positioned in a calcination stage (17), upstream of its branching and splitting between the several heat exchanger trains (A, B).
An installation including a rotary kiln for the production of cement clinker from raw meal, which is preheated in at least two mutually parallel cyclone suspension heat exchanger trains and precalcined in a fueled calcination stage, from which a gas-solid suspension line is fed by suspension splitting into the lowermost cyclone stage of each cyclone suspension heat exchanger train for the purpose of separating the precalcined raw meal from a rotary kiln off-gas line, the precalcined raw meal substreams of the heat exchanger trains subsequently being fed directly into the rotary kiln for cement clinker burning, comprising:
The installation as set forth in claim1 wherein said vortex homogenization chamber includes a conical part providing flow restriction to said outlets to said said discharge pipes.
An installation for the production of cement clinker from raw meal comprising:
Dependencies are inferred from the claim text.