Surveying of boreholes
AssigneeSmart Stabilizer Systems Limited
InventorsMichael Russell, Anthony William Russell
Life of this patent
Estimating the term…
Abstract
A borehole drilling and survey assembly includes a drill string of magnetic material, a non-magnetic drill collar, and a non-magnetic rotary drilling system including a drill bit. A near-bit survey instrument is located in the rotary drilling system at a fixed distance from the junction of the drill string and the drill collar. A second survey instrument is located in the drill collar at a fixed distance from said junction. The survey instruments measure the local values of the component of the earth's magnetic along the borehole axis, and these values are processed to remove the magnetic effects of the drillstring. The survey instruments optionally also measure gravity vector components to enable borehole heading to be derived.
Claims7
Apparatus for surveying the magnetic azimuth of a borehole penetrated by a bottom-hole assembly comprising a magnetic drill string attached to one end of a substantially non-magnetic drilling bit assembly, said apparatus comprising magnetic field measuring means for measuring the longitudinal magnetic field BZ(a) at a first predetermined point which is along the length of the substantially non-magnetic drill collar, and for measuring the longitudinal magnetic field BZ(b) at a second predetermined point which is along the length of the substantially non-magnetic drilling bit assembly, to provide a longitudinal-position-dependent pair of longitudinal magnetic field measurements BZ(z).
A method of surveying the magnetic azimuth of a borehole penetrated by a bottom-hole assembly which comprises a magnetic drill string attached to one end of a substantially non-magnetic drill collar to the other end of which is attached a substantially non-magnetic drilling bit assembly;
- said method comprising the steps of:
- measuring the longitudinal magnetic field BZ(a), where longitudinal magnetic field is defined as the component of the magnetic field B in the direction of the longitudinal axis of the borehole in the region of the substantially non-magnetic drill collar, at a first predetermined point which is along the length of the substantially non-magnetic drill collar;
- measuring the longitudinal magnetic field BZ(b) at a second predetermined point which is along the length of the substantially non-magnetic drilling bit assembly, thereby providing a longitudinal-position-dependent pair of longitudinal magnetic filed measurements BZ(z);
- and, on the assumption that the longitudinal magnetic field error E(z) is induced by a single notional magnetic pole in the magnetic drill string substantially at the attachment of the magnetic drill string to the substantially non-magnetic drill collar, calculating the corrected magnetic azimuth AZc from the relationship:
- cot(AZc)*(b2-a2)=b2 cot(AZb)−a2 cot(AZa)
- where AZa is the uncorrected azimuth at said first predetermined point, AZb is the uncorrected azimuth at said second predetermined point, a is the distance between the first predetermined point and said notional magnetic pole, and b is the distance between the second predetermined point and said notional magnetic pole.
Dependencies are inferred from the claim text.