Method for increasing the bearing capacity of foundation soils for built structures
AssigneeUretek Worldwide Oy
InventorCarlo Canteri
Life of this patent
Estimating the term…
Abstract
A method for increasing the bearing capacity of foundation soils for built structures consisting of providing a plurality of holes spaced from each other deep in the soil, and injecting into the soil, through the holes, a substance which expands as a consequence of a chemical reaction, with a potential increase in volume of at least five times the volume of the substance before expansion. The expansion of the substance injected into the soil produces compaction of the contiguous soil.
Claims23
A method for increasing the bearing capacity of foundation soils for built a structures comprising:
- providing a plurality of holes spaced from each other, under the foundation of a built structure, deep in the foundation soil;
- injecting into the foundation soil, through said holes, a substance which expands as a consequence of a chemical reaction;
- producing compaction of the foundation soil contiguous to the injection one due to the expansion of said substance injected into the soil;
- constantly monitoring level variations of the soil and/or built structures overlying the injection zone to detect the moment when the built structures and/or the soil surface, overlying injection zone, begins to raise which is the moment in which the compaction of the foundation soil has reached levels generally higher than a required minimum value at which the soil lying below and around said injection zone withstands and rejects dynamic and static weights exerted thereon by said built structures and by overlying and adjacent soil masses, and wherein the expansion of the injected substance is cry fast with a potential increase in volume of the expanded substance being at least five times the volume of the substance before expansion.
A method for increasing the bearing capacity of foundation soils for built structures comprising:
- providing a plurality of holes spaced from each other deep in the foundation soil;
- providing an expandable substance with very fast expansion time and with a potential increase in volume of the expanded substance being at least five times the volume of the substance before expansion;
- injecting into the soil, through said holes, said substance which expands as a consequence of a chemical reaction, the injection being performed continuously along rising columns;
- producing compaction of the soil contiguous to each substance injection zone due to expansion of said substance injected into the foundation soil which forms, along said columns, tree-like shapes with irregular configuration including protrusions, bumps and projections produced by different resistance to compaction of the foundation soil and due to voids, interstices or fractures present under said structure and into the foundation soil;
- and
- constantly monitoring level variations of the soil surface and/or built structure overlying the injection zone to detect a moment when the built structure and/or the soil surface, overlying said injection zone, begins to raise which is the moment when the compaction of the soil has reached levels generally higher than a required minimum value at which the soil lying below and around said injection zone withstands and rejects dynamic and static weights exerted thereon by said built structures and by and adjacent soil masses.
A method for increasing the bearing capacity of foundation soils for built structures comprising:
- providing a plurality of holes spaced from each other, under the foundation of a built structure, deep in the foundation soil;
- providing an expandable substance with very fast expansion time and with a potential increase in volume of the expanded substance being at least five times the volume of the substance before expansion;
- injecting into the soil, through said holes, said substance which expands as a consequence of a chemical reaction;
- producing compaction of the soil contiguous to the substance injection zone through expansion of said substance injected into the foundation soil until the soil compaction reaches levels which are generally higher than a minimum compaction value required to provide a bearing capacity of the foundation soil suitable to withstand an dynamic and static weight exerted thereon by the built structures and by overlying and adjacent soil masses;
- and
- determining attainment of aid minimum compaction value required by constantly monitoring level variations of the soil surface and/or of the built structure overlying said injection zone to detect a moment when the built structure and/or the soil surface, overlying said injection zone, begins to raise, which is the moment when the soil lying below and around said injection zone withstands and rejects upwardly the dynamic and static weight exerted thereon by said built structures and overlying and adjacent soil masses.
A method for increasing the bearing capacity of foundation soils for built structures comprising:
- establishing appropriate treatment levels located at different depths in a foundation soil requiring bearing capacity increasing, said foundation soil being at least that part of soil having to withstand dynamic and static weights exerted by a built structure and by overlying and adjacent soil masses;
- providing a plurality of hole spaced from each other deep in the foundation soil so as to reach said treatment levels;
- providing an expandable substance with very fast expansion time and with a potential increase in volume of the expanded substance being at least five times the volume of the substance before expansion;
- injecting into the soil, through said holes said substance which expands as a consequence of a chemical reaction;
- producing compaction of the soil contiguous to each substance injection zone by way of the expansion of said sub injected into the foundation soil;
- and
- estimating the bearing capacity achieved in the foundation soil treated with expanding substance injections by constantly monitoring the level of the soil surface and/or built structure overlying the in injection zone to detect a moment when the built structure and/or the soil surface, overlying zone, begins to raise which is the moment when the compaction of the soil due to the substance expansion has reached levels generally higher a required minimum value at which the soil lying below and around said injection zone withstands and rejects dynamic and static weights exerted thereon by said built structures and by overlying and adjacent soil masses.
A method for increasing the bearing capacity of foundation soils for built structures comprising:
- establishing appropriate eat levels located at different depths in a foundation soil requiring bearing capacity increasing, said foundation soil being at least that part of soil withstanding dynamic and tic weights exerted by a built structure and by overlying and adjacent soil masses;
- providing a plurality of ho spaced from each other deep in the foundation soil so as to reach said treatment levels;
- providing an expandable balance with very fast expansion time and with a potential increase in volume of the expanded substance being at least five times the volume of the substance before expansion;
- injecting into the soil, through said holes, a quantity of said substance which expands as a consequence of a chemical reaction;
- producing compaction of soil contiguous to the substance injection zone by way of the expansion of said quantity of substance injected into the foundation soil until the soil compaction reached levels which are generally higher than a minimum compaction value requiring to provide a bearing capacity of the foundation soil suitable to withstand any dynamic and static weight exerted thereon by the built structures and by overlying and adjacent seen soil masses;
- and
- detecting reaching of said urn compaction value required by constantly monitoring level variations of the soil surface and/or of kite built structure overlying said injection zone to detect a moment when the built structure and/or the soil surface, overlying said injection zone, begins to raise, which is the moment when the soil lying below and around said injection withstands and rejects upwardly the dynamic and static weight exerted thereon by said built structures and overlying and adjacent soil masses;
- and
- carrying out said expendable substance injection at said treatment levels at least until said minimum compaction value detected through said monitoring is reached.
Dependencies are inferred from the claim text.