Method and apparatus for post-tensioning segmented concrete pilings
OwnerFrederick S. Marshallinventor
Life of this patent
Estimating the term…
Loading patent…
OwnerFrederick S. Marshallinventor
Estimating the term…
A foundation repair piling made up of segments is post tensioned by a cable fed into the segments after the piling is installed. A cable anchor serves as a base segment of multiple concrete piling segments. After installing all the concrete segments on top of the base segment, a cable is inserted into passages in the segments. The cable is threaded through the completely installed piling segments and into the cable anchor. After the cable bottoms out in the cable anchor, upward tension is applied to the cable. As the cable is pulled, cable lock members in the cable anchor increase gripping pressure even as the cable tension increases, thereby solidly anchoring the end of the cable in the cable anchor. After the desired tension is reached, the cable is terminated at the top of the last segment. The tension is held by a termination lug at the top end of the cable.
A cable anchor adapted to be located at the bottom of a foundation piling having a plurality of piling segments, each having an aligned hole for receiving a cable, comprising:
A cable anchor adapted to be located at the bottom of a foundation piling having a plurality of piling segments, each having an aligned hole for receiving a cable, comprising:
A cable anchor adapted to be located at the bottom of a foundation piling having a plurality of piling segments, each having an aligned hole for receiving a cable, comprising: