Tracking the positional relationship between a boring tool and one or more buried lines using a composite magnetic signal
AssigneeDigital Control Incorporated
InventorsJohn E. Mercer, Albert W. Chau
Life of this patent
Estimating the term…
Loading patent…
AssigneeDigital Control Incorporated
InventorsJohn E. Mercer, Albert W. Chau
Estimating the term…
A boring tool is moved through the ground in a region which includes at least one electrically conductive in-ground line and which is subject to static magnetic fields including the magnetic field of the earth. Tracking a positional relationship between the boring tool and the line, as well as a directional heading of the boring tool within the region are provided by: (i) generating a time varying magnetic field from the line; (ii) at the boring tool, detecting a composite magnetic signal which includes one component affected by the static magnetic fields and another component affected by the time varying magnetic field such that the static magnetic field component varies as a function of the directional heading and the time varying component varies as a function of the positional relationship; and (iii) processing the composite magnetic signal to separate the static magnetic field component and the time varying magnetic field component from the composite magnetic signal for use in determining the directional heading and the positional relationship. In one feature, the static magnetic field component is used to determine the directional heading of the boring tool and the time varying magnetic field component is used to determine the positional relationship.
In a system including a boring tool and a drill string having a length which is fed out to move the boring tool through the ground in a region which includes a plurality of electrically conductive in-ground lines, a method for tracking the specific positional relationships between the boring tool and each of said lines, said method comprising the steps of:
In a system including a boring tool and a drill string having a length which is fed out to move the boring tool through the ground in a region which includes a plurality of electrically conductive in-ground lines, a method for tracking the specific positional relationships between the boring tool and each of said lines, said method comprising the steps of:
Dependencies are inferred from the claim text.