Method and apparatus for a horizontal pipe handling system on a self-elevating jack-up drilling unit
AssigneeFriede & Goldman, Ltd.
InventorHoward W F Day
Life of this patent
Estimating the term…
Loading patent…
AssigneeFriede & Goldman, Ltd.
InventorHoward W F Day
Estimating the term…
A pipe handling system is designed for use on an offshore structure, particularly an offshore structure provided with a cantilevered drill floor. The pipe handling system allows to handle significantly longer sections of tubulars, up to 100 feet, if necessary. The pipe handling system transports the pipes from a horizontal pipe rack adjacent to a drill floor to a vertical orientation in a set-back area of the drill floor where the drill string or casing is made up for lowering down hole. The cantilevered drill floor allows to save valuable platform space, while not significantly increasing the cost of the drilling rig. The pipe handling system, while increasing the length of handled tubulars, reduces the number of joints for making of a drill string, thereby significantly reducing the cost of pipe handling operations.
An offshore structure comprising a platform, a cantilevered drill floor portion, a vertical storage area for tubular members formed on said cantilevered drill floor portion adjacent a well bore, and
A system for handling tubular members at an offshore structure, comprising:
An offshore drilling unit, comprising:
A method of moving tubular members from a horizontal storage area to a vertical storage area on a cantilevered drill floor, comprising the following steps:
A method of moving tubular members on an offshore structure, comprising the following steps:
Dependencies are inferred from the claim text.