A semisubmersible multipurpose unit (MPU) having a deck, a multipurpose tower secured to the deck, supports, pontoons connected to the supports with each pontoon adapted for ballast transfer, at least two hawsers connected to the MPU for connecting the MPU to an object at sea having a mooring system, a hawser guidance system to direct each hawser to the object at sea, a crane secured to the deck of a semisubmersible MPU, and at least an 6-point mooring system, wherein the combination of the semisubmersible MPU, hawsers and 6-point mooring system create a global equilibrium between the mooring system of an object at sea and the at least 6-point mooring system and the hawsers have both an elasticity sufficient to accommodate the wave frequency between the object at sea and the MPU and a stiffness adequate to synchronize the average and low frequency movements during a 10-year storm.
A semisubmersible multipurpose unit (MPU) adapted for use in wellhead surface operations comprising:
A mooring and tender system for securing a tender to a production platform comprising
A method for erecting a disassembled multipurpose tower from the deck of a multipurpose unit (MPU) and onto a production platform, wherein said MPU comprises a deck, a plurality of supports having a rounded shape connected to said deck, a plurality of pontoons connected to the supports, each pontoon being adapted for ballast transfer, at least two hawsers connected to the MPU for connecting the MPU to an object at sea having a mooring system, a hawser guidance system to direct each hawser to the object at sea;
A method for disassembling an erected multipurpose tower on a platform and removing and re-assembling the multipurpose tower on a multipurpose unit (MPU), wherein said MPU comprises a deck, a plurality of supports having a rounded shape connected to said deck, a plurality of pontoons connected to said supports, each pontoon being adapted for ballast transfer, at least two hawsers connected to said MPU for connecting said MPU to an object at sea having a mooring system, a hawser guidance system to direct each of said at least two hawsers to the object at sea;
A method for disassembling a multipurpose tower from a multipurpose unit (MPU) and erecting said multipurpose tower on a platform, wherein the MPU comprises a deck, a plurality of supports having a rounded shape connected to said deck, a plurality of pontoons connected to said plurality of supports, each pontoon being adapted for ballast transfer, at least two hawsers connected to said MPU for connecting said MPU to an object at sea having a mooring system, a hawser guidance system to direct each hawser to the object at sea;
A method for disassembling a multipurpose tower erected on a platform to the deck of a multipurpose unit (MPU), said MPU comprising a deck, a plurality of supports having a rounded shape connected to the deck, a plurality of pontoons connected to said plurality of supports, each pontoon being adapted for ballast transfer, at least two hawsers connected to said MPU for connecting said MPU to an object at sea having a mooring system, a hawser guidance system to direct each of said at least two hawsers to the object at sea;
A method for handling tubulars on a multipurpose unit (MPU), said MPU comprising a deck, a plurality of supports having a rounded shape connected to the deck, a plurality of pontoons connected to said plurality of supports, each pontoon being adapted for ballast transfer, at least two hawsers connected to said MPU for connecting said MPU to an object at sea having a mooring system, a hawser guidance system to direct each of said at least two hawsers to the object at sea;
A multipurpose tower (MPT) for use on a multipurpose unit (MPU) deck, said MPU comprising a deck, a plurality of supports having a rounded shape connected to the deck, a plurality of pontoons connected to said plurality of supports, each pontoon being adapted for ballast transfer;
A method of using a multipurpose unit (MPU) for the purpose of coil tubing intervention wherein the MPU is associated with a subsea well in which is installed a Christmas tree having a corrosion cap, a blow-out preventor (BOP), a master valve, and a subsurface safety control valve, and wherein said MPU comprises a deck, a configuration that results in a combined environmental load less than 1000 kips in a 100-year extreme weather condition, a plurality of supports having a rounded shape and connected to said deck, a plurality of pontoons connecting said plurality of supports, each of said plurality of pontoons being adapted for ballast transfer, and an at least 8-point tender mooring system, said method of coil tubing intervention comprising the steps of:
A method of using a semi-submersible multipurpose unit (MPU) for the purpose of the removal of a subsea Christmas tree, wherein the MPU comprises a deck, a configuration that results in a combined environmental load less than 1000 kips in a 100-year extreme weather condition, a plurality of supports having a rounded shape and connected to said deck, a plurality of pontoons connecting said plurality of supports, each of said plurality of pontoons being adapted for ballast transfer, an at least 8-point mooring system, wherein said Christmas tree comprises a corrosion cap, a BOP, a master valve and a subsurface safety control valve, said method of removal of a subsea Christmas tree comprising the steps of:
A method of using a semi-submersible multipurpose unit (MPU) having a modular tower installed thereon, for the purpose of conducting a subsea well intervention operation in a subsea well on which there is installed a corrosion cap, said MPU comprising a deck, a configuration that results in a combined environmental load less than 1000 kips in a 100-year extreme weather condition, a plurality of supports each having a rounded shape and connected to said deck, a plurality of pontoons connecting said plurality of supports, each of said plurality of pontoons being adapted for ballast transfer, an at least 8-point mooring system, said method comprising the steps of:
A method for drilling and completing a well from a deep draft caisson vessel (DDC), wherein the multipurpose unit (MPU) is tendered to the DCC in a tender assist mode, said said MPU comprising a deck, a configuration that results in a combined environmental load less than 1000 kips in a 100-year extreme weather condition, a plurality of supports each having a rounded shape and connected to said deck, a plurality of pontoons connecting said plurality of supports, each of said plurality of pontoons being adapted for ballast transfer, an at least 6-point mooring system, said method comprising the following steps: