Well completion method
OwnerCharles D. Ebingerinventor
Life of this patent
Estimating the term…
Loading patent…
OwnerCharles D. Ebingerinventor
Estimating the term…
An improved method of completing unconsolidated subterranean formations is provided whereby the necessity of expensive high density brine completion fluids is eliminated. Also, the drilling rig time is eliminated or reduced. In one embodiment, the method involves placing a bridge plug below the zone, and displacing drilling mud with a lighter weight completion fluid such as potassium chloride fluid whereby the lighter weight completion fluid does not in itself create a sufficient bottom hole hydrostatic well pressure to control the well. Except for monobore/tubingless completions, a production packer and production tubing string may be placed in the well, if not already in place from a prior completion. The wellhead tree is placed on the well, two subsurface safety valves may be installed in the tubing, and the rig may be released from the wellsite. Sufficient pressure may be applied at the surface to thereby increase the bottom hole hydrostatic pressure to amount sufficient to control the well. The zone is perforated through tubing with an electric line conveyed gun under pressure. A dual-screen (vent-screen) device to control formation sand production is deployed on electric line, braided line, or coiled tubing. The dual-screen device is placed on top of the bridge plug, and the well is Frac Packed, or gravel packed down the tubing. The excess proppant/sand is then flowed from the well, or coiled tubing is used to wash the excess out of the well. The zone is then put on production.
A method of completing a well having a wellbore and one or more production zones comprising a first selected production zone with a first selected production zone formation pressure, said method comprising:
A method of completing a well having a wellbore and one or more production zones comprising a first selected production zone with a first selected production zone formation pressure, comprising:
A method of completing a well having a wellbore and one or more production zones comprising a first selected production zone with a first selected production zone formation pressure, said well comprising a second production zone at a well depth above said first selected production zone, said second selected production zone having a second selected production zone formation pressure, whereby after said first selected production zone is to be shut off then said second selected production zone is to be brought into production, said method comprising:
A method for a monobore well completion wherein a well has one or more production zones comprising a first selected production zone with a first selected production zone formation pressure, said monobore well completion comprising at least one tubular string cemented in a wellbore such that said at least one tubular string has no production packer mounted therein, said method comprising:
Dependencies are inferred from the claim text.