Air-conditioning controlling system
AssigneeHitachi, Ltd.
InventorsKeiji Sasao, Tadakatsu Nakajima
Life of this patent
Estimating the term…
Loading patent…
AssigneeHitachi, Ltd.
InventorsKeiji Sasao, Tadakatsu Nakajima
Estimating the term…
An air-conditioning operation management company provides control information concerning air-conditioning equipments to a plurality of semiconductor manufacturing factories. The air-conditioning operation management company stores a measured result of an outside-air condition measuring unit in a past outside-air condition record database and obtains forecasted maximum temperature information on-that day from a weather forecast providing system. An outside-air condition transition forecasting unit forecasts all, transition of the outside-air condition on that day on the basis of the forecasted maximum temperature information. Information stored in an air-conditioning thermal load database, an air-conditioning equipment characteristic database and a set-temperature-and-humidity-of-air-conditioning-equipment database are employed to provide an optimum operation method of the air-conditioning equipments to the semiconductor manufacturing factories. Further, a forecasted result of an outside-air condition transition, an analyzed result of an air-conditioning thermal load and an analyzed result of a controlling method are displayed in customer terminals.
An air-conditioning controlling system for providing a controlling method of an air-conditioning equipment including a number of control components to a factory or company provided with said air conditioning equipment from an operation management company, wherein air-conditioning loads in said factory or company are classified into loads depending on an outside-air condition and loads based on a product plan and said operation management company provides said control method of controlling said control components constituting said air-conditioning equipment with said loads depending on the outside-air condition on the basis of a forecasted outside-air condition on that day calculated from past outside-air condition records on and before the previous data at least and of controlling said control components constituting said air-conditioning equipment with said loads based on said product plan in substantially the same condition as on the previous day, to said factory or company.
An air-conditioning controlling system in a semiconductor manufacturing factory connected to an operation management company through a network, wherein
Dependencies are inferred from the claim text.