Method for the variable manufacture of concrete railroad ties
AssigneePfleiderer Infrastrukturkturtechnik GmbH
InventorWinfried Mohr
Life of this patent
Estimating the term…
Abstract
A method for a variable manufacture of concrete railroad ties, with or without prestressed reinforcement, is provided wherein molds are cleaned in a preparation station and provided with the reinforcements, and are subsequently filled with concrete in a concreting and shaking station. Then the railroad ties are cured by a heat treatment. All railroad ties are produced in multiple molds, preferably in quadruple molds having identical dimensions, and the heat treatment is carried out in heating chambers. The heating chambers are loaded and unloaded with the concrete-filled molds by means of a shelf servicing device, which also supplies the molds to a stress relieving and emptying station which leads to the preparation station. Furthere provided is an apparatus for implementing this method.
Claims8
A method for variable manufacture of concrete railroad ties, comprising:
- providing a plurality of molds, each of the molds being a multiple mold;
- serially cleaning the molds in a preparation station;
- serially providing at least one of the plurality molds with prestressed reinforcement at a stressing station while leaving at least one of the plurality molds without a prestressed reinforcement;
- serially filling the plurality of molds with concrete in a concreting and shaking station to form the railroad ties;
- serially loading the plurality of molds, including the at least one of the molds having a prestressed reinforcement and the at least one of the molds without a prestressed reinforcement, filled with concrete respectively into any ones of a plurality of individual heating chambers in a common curing station;
- curing the railroad ties by exposure to at least a first heat treatment for the at least one of the molds having a prestressed reinforcement in a corresponding at least one of the individual heating chambers and exposure to at least a second heat treatment for curing the at least one of the molds without a prestressed reinforcement in a corresponding at least one of the heating chambers including, the curing including:
- individually monitoring respective curing times of the first heat treatment and the second heat treatment of the plurality of molds in the respective ones of the plurality of individual heating chambers, including the at least one of the molds having a prestressed reinforcement and the at least one of the molds without a prestressed reinforcement;
- and
- serially unloading the plurality of molds from the individual heat chambers after respective ones of the curing times of the first heat treatment and the second heat treatment have passed;
- and
- serially transferring the plurality of molds to a stress relieving and emptying station located ahead of the preparation station after respective ones of the plurality of molds have completed curing and have been unloaded.
Dependencies are inferred from the claim text.