Production planning method, a storage medium and a production planning apparatus
AssigneeKabushiki Kaisha Toshiba
InventorsKen Iriuchijima, Hideo Sakamoto, Mutsumi Fujihara
Life of this patent
Estimating the term…
Loading patent…
AssigneeKabushiki Kaisha Toshiba
InventorsKen Iriuchijima, Hideo Sakamoto, Mutsumi Fujihara
Estimating the term…
A production plan is made for a production line for producing finished products from a raw material. Based on the stock number of works in respective process steps at a planning time, the number of works processed at the respective process steps up to the planning time is calculated as the current cumulated processed works of the respective process steps. The target of the stock number of works in the respective process steps at a planned time following a passage of a plan period is calculated based on a target production representing the number of finished products outputted up to the planned time and an average cycle time of production from the raw material to finished products. The target cumulated processed works of the respective process steps at the planned time is calculated based on the target of the stock number of works in the respective process steps. The number of works necessary to be processed in the respective process steps during a period from a planning time to a planned time is calculated, as a process step load of the respective process steps, based on the current cumulated processed works of the respective process steps at the planning time and the target of the total number of the respective process steps at the planned time.
A production planning method for making a production plan in a production line for producing finished products from a raw material, a raw material-to-finished product production process being divided into a plurality of process steps, a plurality of equipments being arranged at the production line, and at least one of the equipments participating in a least two of the process steps, the method comprising:
A memory storing a computer-executable program code, a production plan being made by the program code in a production line for producing finished products from a raw material, a raw material-to-finished product production process being divided into a plurality of process steps, a plurality of equipments being arranged at the production line, and at least one of the equipments participating in at least two of the process steps, the program code comprising:
A production planning apparatus for making a production plan in a production line for producing finished products from a raw material, a raw material-to-finished product production process being divided into a plurality of process steps, a plurality of equipments being arranged at the production line, and at least one of the equipments participating in at least two of the process steps, the apparatus comprising:
A production planning method for making a production plan in a production line for producing finished products from a raw material through a plurality of process steps, the method comprising steps of:
Dependencies are inferred from the claim text.