Realtime decision making system for reduction of time delays in an automated material handling system
AssigneeAdvanced Micro Devices, Inc.
InventorsMichael R. Conboy, Patrick J. Ryan, Elfido Coss
Life of this patent
Estimating the term…
Loading patent…
AssigneeAdvanced Micro Devices, Inc.
InventorsMichael R. Conboy, Patrick J. Ryan, Elfido Coss
Estimating the term…
A method for pre-positioning routed material in a computer controlled manufacturing arrangement having alternate locations for predetermined ones of a plurality of manufacturing process steps and predetermined types of materials to be routed into alternate locations. The method includes establishing a distribution of events indicative of the alternate locations at which material is processed for a manufacturing process step with respect to the materials to be routed and documenting the distribution of events in a database with respect to the type of materials to be routed and the alternate locations in terms of routing times, therein establishing a historical routing time for the type of material to be routed. In addition, there is established the actual mix of materials to be routed to the alternate locations and their historical routing time and actual routing time for the type of routed material are compared. Further, one of a plurality of substates is selected that include: pre-position routed material when historical and actual times are substantially the same, hold routed material when the times are different and re-route material when time comparison is not available. Finally, one of a plurality of alternate locations is selected to which to route the material for the next manufacturing process step as a function of a one of the substates.
A method for routing objects in a computer controlled manufacturing arrangement having alternate locations for predetermined ones of a plurality of manufacturing process steps and predetermined types of objects to be routed into alternate locations, comprising the steps of:
An apparatus for routing objects in a computer controlled manufacturing arrangement having alternate locations for predetermined ones of a plurality of manufacturing process steps and predetermined types of objects to be routed into alternate locations, comprising:
An automated manufacturing arrangement for routing objects between locations in a factory floor, comprising:
Dependencies are inferred from the claim text.