Method and apparatus for production testing involving first and second permeable formations
AssigneeShore-Tec AS
InventorRune Woie
Life of this patent
Estimating the term…
Loading patent…
AssigneeShore-Tec AS
InventorRune Woie
Estimating the term…
When production testing a permeable first formation, fluid flowing out from the first formation is subjected to a pressure measurement and a flow rate control. In order to avoid bringing up the fluid flowing out during the production test to a surface position, where the fluid's inherent explosion and fire risk as well as poisonousness could cause substantial problems, a fluid flow path is arranged for fluid transfer only between the first and second formations. The fluid flow path which, in a suitable apparatus, is constituted by a channel-forming pipe. From this channel, the second permeable formation receives the fluid and keeps it for some time. In the position of use, the apparatus is assigned sealing devices such as annulus packers, which are placed such that fluid flow between the formations is limited to only follow the fluid flow path.
A production test method for production testing an expected permeable first formation subjected to subsurface formation pressure, said first formation being penetrated by a well, comprising:
An apparatus to be mounted in a well penetrating an expected permeable first formation to be production tested and, at a different level of the well, a permeable second formation, both formations being subjected to subsurface formation pressures, which formations are expected not to be in fluid communication with one another outside of the well, comprising:
Dependencies are inferred from the claim text.