Cooling steam control method for combined cycle power generation plants
AssigneeMitsubishi Heavy Industries, Ltd.
InventorsTakashi Sonoda, Yoshiyuki Kita, Tomoka Tanaka
Life of this patent
Estimating the term…
Loading patent…
AssigneeMitsubishi Heavy Industries, Ltd.
InventorsTakashi Sonoda, Yoshiyuki Kita, Tomoka Tanaka
Estimating the term…
The present invention is characterized in controlling the amount of cooling steam supplied to high temperature parts 8 in accordance with the dynamic characteristics of exhaust heat recovery boiler 2 when the load on gas turbine 1C is changing, in a gas turbine steam cooling system provided with an exhaust heat recovery boiler 2 for operating gas turbine 1C and generating steam using the exhaust heat from gas turbine 1C, the combined cycle plant being controlled by driving the steam turbines 3,4 by directing a steam line from exhaust heat recovery boiler 2 to steam turbines 3,4, cooling high temperature parts 8 of gas turbine 1C by branching the steam line from exhaust heat recovery boiler 2, and returning the cooled steam to the steam line.
A cooling steam system control method for a combined cycle plant, wherein the system includes a gas turbine load characteristics detecting device a steam temperature detecting device connected to the steam line at the exit of the high temperature components, comprising the steps of:
Dependencies are inferred from the claim text.