Path scheduling method and system for rolling mills
AssigneeKabushiki Kaisha Toshiba
InventorMasashi Tsugeno
Life of this patent
Estimating the term…
Loading patent…
AssigneeKabushiki Kaisha Toshiba
InventorMasashi Tsugeno
Estimating the term…
A tandem rolling mill (FM) has mill stands (Fi; i=1 to 7) to be controlled in conformity with given rolling conditions (j) to execute a given path schedule for a coil (1) to be rolled by rolls (WR) of the mill stands (Fi) to scheduled thicknesses (hi) at exit sides of the mill stands (Fi), with scheduled peripheral speeds (Vi) of the rolls (WR). The mill stands (Fi) are checked for non-conformity with any rolling condition (j), correction amounts (Δγi) are calculated of normalized values (γi*) of rolling forces (Pi*) of non-conforming mill stands (Fi*), as necessary to meet any rolling condition (j*), the normalized values (γi*) are corrected by a maximal one of the correction amounts (Δγi) to provide corrected values as targets (γti*) to be achieved at the non-conforming stands (Fi*), and the given path schedule is re-scheduled to achieve the targets (γti*) by determining re-scheduled thicknesses (hi) of the coil (1) and re-scheduled peripheral speeds (Vi) of the rolls (WR), both independently defining a mass flow of the coil (1) to be constant at the respective mill stands (Fi).
A path scheduling method for a tandem rolling mill having a plurality of mill stands to be controlled in conformity with a plurality of given conditions and a plurality of given constraints thereto to execute a given path schedule for a coil to be rolled by rolls of the plurality of mill stands to scheduled thicknesses at exit sides of the plurality of mill stands, with scheduled peripheral speeds of the rolls, the path scheduling method comprising the steps of:
A path scheduling system for a tandem rolling mill having a plurality of mill stands to be controlled in conformity with a plurality of given conditions and a plurality of given constraints thereto to execute a given path schedule for a coil to be rolled by rolls of the plurality of mill stands to scheduled thicknesses at exit sides of the plurality of mill stands, with scheduled peripheral speeds of the rolls, the path scheduling system comprising: