Articulated boom monitoring system
AssigneeSchwing America, Inc.
InventorsThomas M. Anderson, Alex Krasny, Phil Serre, Thomas Eggert, Robert Edwards
Life of this patent
Estimating the term…
Loading patent…
AssigneeSchwing America, Inc.
InventorsThomas M. Anderson, Alex Krasny, Phil Serre, Thomas Eggert, Robert Edwards
Estimating the term…
A monitoring system is provided for monitoring positioning and stability of an articulated boom system The articulated boom system includes an articulated boom, having one or more boom sections, extending from a base, along with one or more outriggers extending from the base. The monitoring system includes a load sensor placed on a leading end of the articulated boom, a boom position sensor placed on the leading end, an outrigger sensor placed on the outrigger(s) and a computer. The load sensor delivers a signal to the computer indicative of the load on the leading end The boom position sensor delivers information to the computer indicative of the position of the leading end with respect to the base. The outrigger sensor delivers a signal to the computer indicative of the extension of the outrigger(s) from the base. The computer determines the position of the articulated boom based upon the sensed position of the leading end. Further, the computer monitors the of the stability of the articulated boom system based upon the sensed load, articulated boom position, outrigger(s) extension and predetermined data.
A monitoring system for monitoring stability of an articulated boom and pipeline concrete placing system, the articulated boom and pipeline system including an articulated boom for supporting the pipeline having a bottom end rotatably connected to a base and a leading end which is maneuverable with respect to the bottom end, the base further including at least one extendable outrigger, the monitoring system comprising:
A method for monitoring stability of an articulated boom and pipeline concrete dispensing system, the articulated boom and pipeline system including an articulated boom for supporting the pipeline having a plurality of boom sections, the boom having a bottom end rotatably connected to a base and a leading end which is maneuverable with respect to the bottom end, the base further including an outrigger, the method including:
A method of controlling an articulated boom and pipeline concrete conveying system at a work site, the articulated boom and pipeline system including an articulated boom for supporting the pipeline having a plurality of boom sections movably coupled by a plurality of actuators, the boom having a bottom end rotatably connected to a base and a leading end which is maneuverable with respect to the bottom end, the method including:
A method of controlling an articulated boom system delivering concrete to a floor for forming a slab, the articulated boom system having a boom with a bottom end rotatably connected to a base and a leading end which is maneuverable with respect to the bottom end, and a delivery hose connected to the boom for delivering concrete from a supply source, the delivery hose including a tip located at the leading end of the boom, the method including:
Dependencies are inferred from the claim text.