Three-batch coal loadout system and method
OwnerHarold A. Walkerinventor
Life of this patent
Estimating the term…
Abstract
A three-batch method for the precision loading of coal into the individual railroad cars of a moving train, and a loadout system implementing the method. For each railcar, three successive batches are made up and discharged from a single weigh bin. The loadout rate of a single-batch system is approached, but at a significantly reduced facility cost. The first batch is large enough to fill the front of the railcar and to establish a "plugged flow condition," allowing the second batch to be made up and discharged while maintaining a constant load profile in the railcar. After the weigh bin is emptied of the second batch, the third batch is made up and discharged. The third batch is made up with greater precision than the first and second batches.
Claims9
A multiple-batch method for loading a moving railroad car from front to back with a target weight of particulate material employing a loadout system including a surge bin, a weigh bin positioned below the surge bin, a controlled charging gate for charging batches of particulate material from the surge bin into the weigh bin, and a controlled discharge gate for discharging particulate material from the weigh bin through a loading chute having a discharge end into the railroad car, said method comprising the steps of:
- as the railroad car approaches the loading chute, charging the weigh bin with a first weighed batch of material sufficient to fill a front portion of the railroad car up to the discharge end of the loading chute so that subsequent flow of material out of the loading chute is controlled by forward movement of the car and to leave a quantity of material in the loading chute sufficient to maintain a continuous flow of material into the railroad car during an interval between when the weigh bin is emptied of the first batch and the weigh bin is charged with a second weighed batch of material;
- discharging the first batch from the weigh bin;
- while material from the first batch is flowing from the loading chute into the railroad car, charging the weigh bin with the second batch, the weight of the second batch being a portion of the remaining material weight required to reach the target weight after the first weighed batch is loaded into the railroad car, and the second weighed batch being sufficient to leave a quantity of material in the loading chute sufficient to maintain a continuous flow of material into the railroad car during an interval between when the weigh bin is emptied of the second batch and the weigh bin is charged with a third weighed batch of material;
- discharging the second batch from the weigh bin;
- while material from the second batch is flowing from the loading chute into the railroad car, charging the weigh bin with the third batch, the weight of the third batch being what is required to reach the target weight after the first and second weighed batches are weighed and loaded into the railroad car;
- and
- discharging the third batch from the weigh bin.
A loadout system for loading successive railroad cars of a moving train with respective target weights of particulate material, said system comprising:
- a surge bin;
- a weigh bin positioned below said surge bin, and at least one transducer connected to said weigh bin for measuring the weight of said weigh bin and particulate material contained therein, said at least one transducer having a weighing transducer output;
- a controlled charging gate for charging batches of particulate material from said surge bin into said weigh bin;
- a loading chute positioned below said weigh bin for conveying particulate material from said weigh bin into the railroad cars, said loading chute having a discharge end;
- a controlled discharge gate for discharging particulate material from said weigh bin;
- a controller connected to said transducer output for determining the weight of said weigh bin and particulate material contained therein, connected to said charging gate for controlling the charging of said weigh bin, and connected to said discharge gate for controlling discharging from said weigh bin, said controller operable,
- as an individual railroad car approaches said loading chute, to open said charging gate, while monitoring said weighing transducer output, so as to charge said weigh bin with a first weighed batch of material sufficient to fill a front portion of the individual railroad car up to said discharge end of said loading chute so that subsequent flow of material out of the loading chute is controlled by forward movement of the individual railroad car and to leave a quantity of material in said loading chute sufficient to maintain a continuous flow of material into the individual railroad car during an interval between when said weigh bin is emptied of the first batch and said weigh bin is charged with a second weighed batch of material, and then to close said charging gate,
- to open said discharge gate, and then to close said discharge gate when said weigh bin is empty,
- while material from the first batch is flowing from said loading chute into the individual railroad car, to open said charging gate, while monitoring said weighing transducer output, so as to charge said weigh bin with the second weighed batch, the weight of the second batch being a portion of the remaining material weight required to reach the target weight for the individual railroad car after the first weighed batch is loaded into the individual railroad car, and the second weighed batch being sufficient to leave a quantity of material in said loading chute sufficient to maintain a continuous flow of material into the individual railroad car during an interval between when said weigh bin is emptied of the second batch and said weigh bin is charged with a third weighed batch of material, and then to close said charging gate,
- to open said discharge gate, and then to close said discharge gate when said weigh bin is empty,
- while material from the second batch is flowing from said loading chute into the individual railroad car, to open said charging gate, while monitoring said weighing transducer output, so as to charge said weigh bin with the third weighed batch, the weight of the third batch being what is required to reach the target weight for the individual railroad car after the first and second weighed batches are weighed and loaded into the individual railroad car, and then to close said charging gate, and
- to open said discharge gate, and then to close said discharge gate when said weigh bin is empty.
Dependencies are inferred from the claim text.