Producing fluids from subterranean formations through lateral wells
AssigneeMobil Oil Corporation
InventorsSteve L. Alexander, Michael R. Chambers, Samuel L. Pickett
Life of this patent
Estimating the term…
Loading patent…
AssigneeMobil Oil Corporation
InventorsSteve L. Alexander, Michael R. Chambers, Samuel L. Pickett
Estimating the term…
Method and apparatus for producing fluids from a production zone(s) by drilling and completing multiple laterals from primary wellbore. One or more pre-formed window units are provided in a casing string before it is cemented in the well. Each unit is comprised of a housing having an inlet and two outlets, one of which forms the pre-formed window. The axes of the two outlets forms a relatively small angle (e.g. from 1.degree. to about 10.degree., preferably 3.degree.) whereby a well string will follow a gently curved path as it exits through the window. A re-entry line from the surface can be attached to the housing so that a work-over string can be lowered into a selective lateral without having to shut-in production from the other laterals.
Apparatus for drilling and completing a lateral wellbore from a primary wellbore, said apparatus comprising:
Dependencies are inferred from the claim text.