Process for excavating a cavity in a thin salt layer
AssigneeGaz de France (G.D.F.) Service National
InventorsJean-Gerard Durup, Guy Boris, Yvon Charnavel
Life of this patent
Estimating the term…
Loading patent…
AssigneeGaz de France (G.D.F.) Service National
InventorsJean-Gerard Durup, Guy Boris, Yvon Charnavel
Estimating the term…
The invention concerns a process for excavating by dissolution an underground cavity in a thin salt layer, in order to store a fluid therein. According to the invention, the process includes the steps of producing an injection duct, an extraction duct, and a void for a communication space which places in communication the injection and extraction ducts, producing at least one blind tunnel void communicating with the communication space so as to enable the solvent to circulate and the salt to dissolve in the blind tunnel, injecting via the injection duct a solvent into the communication space, and extracting via the extraction duct the brine formed by the dissolution of the salt on contact with the solvent. The advantage of this process is that the excavated layer has a mechanically stable shape and a larger volume and is produced more cheaply than with prior processes.
Process for excavating by dissolution an underground cavity in a thin salt layer, the process comprising the following steps:
Process for excavating by dissolution a cavity in ground predominantly containing salt, the process comprising the following steps:
Dependencies are inferred from the claim text.