Safety method of construction a prestressed cable-stay bridge
OwnerWei-Hwang Lininventor
Life of this patent
Estimating the term…
Loading patent…
OwnerWei-Hwang Lininventor
Estimating the term…
A method of construction a prestressed cable-stay bridge is provided. The method includes the constructing at least a tower having a pier, a pair of masts and a girder between the masts for securing a deck, a main beam supported on the deck along a longitudinal direction of the bridge, a pair of sub-beams connect to two ends of the main beam and suspended from a plurality of temporal stay cables from the top of the masts, an upper portion and a plurality of segment secured on the top of the main beam and the sub-beam after the performance of on the spot prestressing procedure, a plurality of side reinforcements secured to the elongate gaps at two lateral side of the bridge, a plurality of permanent stay cables instead of the temporal stay cables for suspending the bridge from the inner side of the masts and a roadway paved on the top of the bridge. This disclosure further includes a plurality of safety plates provide along the lateral sides of the bridge to ensure a safe and convenient working condition to the working personnel.
A method of construction a prestressed cable-stay bridge comprising:
Dependencies are inferred from the claim text.