Stone metering system for railroad track maintenance vehicle
AssigneePandrol Jackson, Inc.
InventorKevin A. Hansen
Life of this patent
Estimating the term…
Loading patent…
AssigneePandrol Jackson, Inc.
InventorKevin A. Hansen
Estimating the term…
A stone metering system for a railroad track maintenance vehicle providing improved accuracy in stone delivery. The system includes a surge hopper, a number of metering augers, and a corresponding number of splitters. The metering augers convey ballast stones from the surge hopper to the corresponding splitters, which divide the stones evenly between a number of blow tubes. The pitch of the auger screw flights is increased from the inlet end of the screw to "expand" the stone and reduce the production of fines. In addition, the diameter of the final screw flight is reduced at the outlet end of the auger to provide a consistent and even flow of stone into the splitters. The splitters are dynamically adjustable to provide even distribution between the blow tubes regardless of the cant to the rails. The desired amount of stone is delivered to the tubes by rotating the auger screw the number of full or partial revolutions associated with the amount. In an alternative embodiment, each of the metering augers is replaced by a conveyor having a belt divided into a series of uniformly sized compartments each conveying the same quantity of stone. The desired amount of stone is delivered to the tubes by driving the belt so that a desired number of compartments are emptied into the splitter.
An improved track maintenance vehicle having a superstructure adapted to travel along a railroad track having a cant and a grade, at least one workhead carried on said superstructure, a plurality of blow tubes carried on said workhead, a supply of ballast stones carried on said superstructure, the stones having a plurality of characteristics, a means for moving the ballast stones from the supply of ballast stones to the workhead, wherein the improvement comprises said means for moving said ballast stones from said supply of ballast stones to said workhead comprising:
An improved track maintenance vehicle having a superstructure adapted to travel along a railroad track, at least one workhead carried on said superstructure, a plurality of blow tubes carried on said workhead, a main hopper containing ballast stones carried on said superstructure, a means for moving the ballast stones from the main hopper to the workhead, wherein the improvement comprises:
A railroad track maintenance vehicle for working railroad track in a railroad track bed, the railroad track having a cant and a grade, said maintenance vehicle comprising:
Dependencies are inferred from the claim text.