Submersible and semi-submersible dry lift carrier and method of operation for carrying a drilling rig and platform
AssigneeEnsco International Incorporated
InventorsFrank B. Williford, Thomas C. Baucke
Life of this patent
Estimating the term…
Loading patent…
AssigneeEnsco International Incorporated
InventorsFrank B. Williford, Thomas C. Baucke
Estimating the term…
A submersible/semi-submersible dry lift carrier for transporting a jack-up drilling rig in a body of water includes a hull, a deck, at least one stability column, and a plurality of ballast compartments capable of being flooded and emptied for lowering and raising the carrier. The carrier further includes at least three leg wells, each well sized and spaced for receiving a leg from a jack-up drilling rig, and each of said wells comprising a vertical passageway having a first end opening through the deck and a second end opening through the bottom of the hull. The carrier further includes at least three pinning receptacles, each receptacle sized and spaced for receiving a spud can and leg from a jack-up drilling rig. In operation, the dry lift carrier is partially submerged by flooding the ballast compartments and then positioned beneath the floating jack-up rig. The carrier is de-ballasted thereby lifting the jack-up rig from a floating "wet" mode to a "dry" mode on the deck of the carrier. Alternatively, the dry lift carrier is submerged and rests on the floor of the body of water. The floating jack-up rig is positioned over the dry lift carrier. The carrier is de-ballasted thereby lifting the jack-up rig on the deck of the carrier.
A dry lift carrier for transporting at least two separate jack-up drilling rigs, a second jack-up drilling rig after a first jack-up drilling rig, in a body of water, each of said jack-up drilling rigs having a floatable platform and at least three legs, said carrier comprising:
A dry lift carrier for transporting a jack-up drilling rig in a body of water, said jack-up drilling rig having a floatable platform and at least three legs terminating in a spud can, said carrier comprising:
A dry lift carrier adapted for transporting a jack-up drilling rig in a body of water, said jack-up rig having a floatable platform and at least three legs, said carrier comprising:
A method of transporting a jack-up drilling rig on a dry lift carrier through a body of water, wherein the jack-up rig includes a floatable platform and at least three legs, and wherein the dry lift carrier includes a hull formed from a plurality of metal plates and containing internal ballast compartments capable of being flooded and emptied, a deck affixed to the hull, at least one stability column, at least one leg well sized for receiving a leg from a jack-up drilling rig, said well having a vertical passageway having a first end opening through the deck and a second end opening through the bottom of the hull, said method of transporting comprising the steps of:
A method of transporting a jack-up drilling rig on a dry lift carrier through a body of water, wherein the jack-up rig includes a floatable platform and at least three legs, and wherein the submersible carrier includes a hull formed from a plurality of metal plates and containing internal ballast compartments capable of being flooded and emptied, a deck affixed to the hull, at least one stability column, at least three leg wells, each sized for receiving a leg from a jack-up drilling rig, each of said wells having a vertical passageway having a first end opening through the deck and a second end opening through the bottom of the hull, and said leg wells having a predetermined spacing mating the spacing of the legs on the jack-up drilling rig, said method of transporting comprising the steps of:
A method of transporting a jack-up drilling rig on a submersible dry lift carrier through a body of water, wherein the jack-up rig includes a floatable platform and at least three legs, and wherein the carrier includes a hull formed from a plurality of metal plates and containing internal ballast compartments capable of being flooded and emptied, a deck affixed to the hull, at least one leg well sized for receiving a leg from a jack-up drilling rig, said well having a vertical passageway having a first end opening through the deck and a second end opening through the bottom of the hull, said method of transporting comprising the steps of:
A method of transporting a jack-up drilling rig with a dry lift carrier through a body of water, wherein the jack-up rig includes a floatable platform and at least three legs terminating at their distal ends in a spud can, and wherein the dry lift carrier includes a hull formed from a plurality of metal plates and containing internal ballast compartments capable of being flooded and emptied, a deck affixed to the hull, at least one stability column, at least three pinning receptacles positioned on the deck, each receptacle having an open top filled with graded material and, each receptacle sized for receiving a spud can and a leg from a jack-up drilling rig, each of said receptacles having a predetermined spacing mating the spacing of the legs on the jack-up drilling rig, said method of transporting comprising the steps of:
A method of transporting a jack-up drilling rig with a dry lift carrier through a body of water, wherein the jack-up rig includes a floatable platform and at least three legs terminating at their distal ends in a spud can, and wherein the dry lift carrier includes a hull formed from a plurality of metal plates and containing internal ballast compartments capable of being flooded and emptied, a deck affixed to the hull, at least three pinning receptacles positioned on the deck, each receptacle having an open top filled with graded material and, each receptacle sized for receiving a spud can and a leg from a jack-up drilling rig, each of said receptacles having a predetermined spacing mating the spacing of the legs on the jack-up drilling rig, said method of transporting comprising the steps of:
Dependencies are inferred from the claim text.