Apparatus and method for optimizing power distributed in a broadband signal system
AssigneeAntec Corporation
InventorJohn Gary Batson
Life of this patent
Estimating the term…
Loading patent…
AssigneeAntec Corporation
InventorJohn Gary Batson
Estimating the term…
A broadband system that simultaneously delivers output power and supplies a broadband signal and has a redundant bus power supply. The system includes a central office having a video gateway. The system further includes a plurality of nodes having a power supply and a combiner for coupling the broadband signal to the power supply output. At each node, a distribution line delivers broadcast services and power to a consumer site. The power supply comprises a battery source, rectifier, filter, inverter and generator to provide a secondary DC power source. The various elements of the power supply are diode isolated and are interconnected via a redundant power bus, thus allowing power to be maintained to the subscribers even in case of failure of one or more elements of the power supply. The power supply further includes a plurality of inverters, each inverter supplies power to a distribution line. A controller monitors the status of each inverter and secondary power source. In addition, the controller monitors output power supplied by each inverter. The controller exchanges control and status information with the power supply and secondary power source through a memory array. By issuing control data to the power supply, the controller compensates for a detected loss of power supplied to each distribution line. The controller transmits status information to the central office.
A power-distribution optimized broadband system, comprising:
A method for optimizing power distributed in a broadband system, the broadband system including a plurality of nodes coupled for receipt of a broadband signal, the nodes each comprising a power supply having a plurality of power outlets to supply power to a plurality of distribution lines coupled to the nodes, and a combiner for coupling the broadband signal to the power outlets, said method comprising the steps of:
A method for optimizing power distributed in a broadband system comprising a power supply having a plurality of power outlets to supply power to a plurality of distributions lines, a plurality of inverters each having a memory for storing status parameters and a controller for monitoring said status parameters in said inverter, wherein each controller includes a scheduler that executes a plurality of tasks according to a priority level assigned to each task, said broadband system including a combiner for coupling a broadband signal to the power outlets said method comprising the steps of:
A power supply for a power-distribution optimized broadband system, said power supply comprising:
A power supply for a power-distribution optimized broadband system, said power supply comprising:
A power supply for use in a node of a broadband communications system, said node receiving a broadband signal and said power supply having a plurality of power outlets to supply power to a plurality of distribution lines coupled to said node, said node having a combiner for coupling said broadband signal to each distribution line, said power supply comprising:
Dependencies are inferred from the claim text.