Visual schedule management system for a manufacturing facility
AssigneeDCD, Ltd.
InventorsWilliam John Borg, Michael Ludwig Stroeder
Life of this patent
Estimating the term…
Loading patent…
AssigneeDCD, Ltd.
InventorsWilliam John Borg, Michael Ludwig Stroeder
Estimating the term…
A computer-based visual schedule management system that provides visual representations of the amount of work scheduled in a manufacturing facility to both enable rapid identification of bottlenecks in the work flow and permit interactive manipulation of job schedules to alleviate conflicts. The user associates realistic images with the work centers of a facility, lays out the work centers on a visual floorplan of the facility to create a graphical shop overview, and instantly refreshes the utilization of each work center in the shop overview. If changes need to be made, the user selects any work center with a pointing device and drills-down to a graphical representation of a production control board to see the details of the jobs that are scheduled for that work center. The user effects changes by simply dragging the job to a new position on the time grid, or by dragging and dropping the job from the production control board of one work center to the production control board of another. Then, by re-displaying the shop overview, the user quickly assesses the impact of the change on the other work centers and can make further changes to the production control boards of the other work centers if necessary. Thus, the work load of an entire manufacturing facility can be visualized and manipulated interactively in a single computer session without the need for paper reports and off-line analysis, promoting more timely decision-making for better productivity.
A method of scheduling jobs and managing work loads on multiple work centers in a manufacturing facility through a visual user interface to a general purpose computer, the method comprising the steps of:
A method of scheduling jobs and managing work loads on multiple work centers in a manufacturing facility through a visual user interface to a general purpose computer having a database, wherein each work center is represented in the database by a maximum work load capacity data item equal to a maximum amount of time the work center operates during a unit of time, and each operation in a sequence of operations required to perform a job is represented in the database by a start date data item, an end date data item, a work center data item, and a work load data item equal to an amount of time required to perform the operation at a work center, the method comprising the steps of:
A system for scheduling job operations and managing work loads on multiple work centers in a manufacturing facility through a visual user interface, comprising:
Dependencies are inferred from the claim text.