Infrastructure for railway tracks
OwnerHermann Ortweininventor
Life of this patent
Estimating the term…
Abstract
An infrastructure for railway tracks with continuous elastic support has two rails forming the track supported via elastic intermediate layers with their lateral limiting surfaces located underneath the rail head against the inner lateral limiting surfaces of a frame consisting of two frame halves and underneath each rail a longitudinal plate consisting of concrete. One of the frame halves rests against a first lateral wall of a trough while the other frame half rests via a wedge against the second lateral wall of the trough.
Claims12
An infrastructure for a railway track comprising:
- a site-mixed concrete elongated plate;
- and
- a rail assembly received in said plate, said assembly comprising:
- an elongated trough formed in the plate with opposite side walls;
- a respective elongated rail received in the trough and spaced laterally inwardly from the side walls of the trough, the rail being formed with a pair of opposite flanks and a head atop the flanks, each of the flanks facing a respective one of the side walls and defining a respective compartment between the flank and the respective side wall;
- a respective pair of elastic intermediate layers each received in the respective compartment underneath the head of the rail, each layer having respective outer and inner opposite lateral surfaces, the inner surface of each layer abutting the respective flank of the rail and the outer surface terminating at a distance from the respective side wall in the respective compartment;
- a respective pair of frame halves each lying against the respective outer face of the respective layer and extending laterally toward the respective side wall of the trough, so that one of the frame halves abuts the respective side wall of the trough, the other frame half terminating at another distance from the respective side wall and forming a subcompartment therewith;
- a wedge extending between and lying respectively against the side wall and the other frame half, thereby filling the subcompartment;
- and
- respective screwing means for tightening the wedge.
An infrastructure for railway tracks laid upon a foundation, comprising:
- a site-mixed concrete elongated plate;
- and
- a rail assembly received in said plate, said assembly comprising:
- an elongated trough formed in the plate with opposite side walls;
- a rail received in the trough and spaced laterally inwardly from the side walls of the trough, the rail being formed with a pair of opposite flanks and a head atop the flanks, each of the flanks facing a respective one of the side walls and defining a respective compartment therebetween;
- at least one respective elastic intermediate layer received in one of the compartments underneath the head of the rail and formed with an inner lateral surface abutting the respective flank of the rail and extending laterally outwardly therefrom toward the respective side wall of the trough, the one layer terminating at a distance from the respective side wall in the respective compartment;
- a frame having an outer lateral face and an inner lateral face which lies against the one layer, the outer lateral face being spaced laterally inwardly from the respective side wall and forming a subcompartment therewith;
- a wedge in said subcompartment extending between and lying respectively against the side wall and the outer lateral face of the frame, thereby filling the subcompartment;
- means for filling the other compartment;
- and
- screwing means for tightening the wedge.
A method for forming an infrastructure for railway tracks laid upon a foundation, comprising the steps of:
- forming an upwardly directed channel on said foundation;
- assembling a pair of identical rail assemblies in said channel, each of the assemblies being formed by the following steps:
- receiving a respective elongated rails in said channel,
- bringing a respective trough under the rail, thereby forming a respective pair of compartments defined between respective flanks of the rail and side walls of the trough,
- filling a one of the pair of compartments with respective means for filling up the one compartment,
- receiving a respective elastic layer abutting a flank of the rail in the other compartment, the elastic layer extending laterally outwardly toward the respective side wall of the trough,
- receiving a respective frame abutting the elastic layer and terminating at a distance from the respective side wall of the trough in the other compartment, and
- receiving a respective wedge lying against the frame and the side wall of the trough in the other compartment, thereby completing the respective assembly;
- aligning the pair of assemblies so that the rails extend in a laterally spaced apart parallel relationship for in indefinite length in said channel;
- and
- thereafter filling said channel with a site-mixed concrete around said troughs, thereby forming a sleeper.
Dependencies are inferred from the claim text.