Single semiconductor wafer transfer method and manufacturing system
AssigneeUnited Microelectronics Corp.
InventorsHong Jen Wu, Taylor Chen, Jack Lai, I. I. Chen
Life of this patent
Estimating the term…
Abstract
A manufacturing system for individually processing semiconductor wafers through a plurality of processing stations. The system has a plurality of processing stations, a multilevel track system that interfaces with the processing stations, and guided transport vehicles that operate on the track system to move individual wafers in wafer carriers between the stations. The carriers have a storage memory that contains the required process sequence and the capability to remember the completed process steps.
Claims8
A method of manufacturing semiconductor devices in a production line having (a) a plurality of semiconductor wafer processing stations, (b) a multilevel track system associated with the processing stations, (c) a plurality of guided transport vehicles adapted to operate independently on said multilevel tracks and each of which carries a wafer carrier between said processing stations, (d) a plurality of wafer carriers, each adapted to support and enclose a single wafer, and (e) a stocker station having a wafer carrier loading area where unprocessed wafers are introduced into the system, and a wafer carrier unloading area where processed wafers are removed from the system, each of said processing stations having (1) a transport vehicle buffer having a load zone and an unload zone, (2) a wafer carrier buffer, (3) a wafer carrier handling means adjusted to transfer wafer carriers between transport vehicles and said wafer carrier buffer, and (4) a wafer handling means to move wafers between the wafer carriers and a wafer processing apparatus at each of said processing stations, the method comprising the steps of:
- loading a process sequence into an information storage memory on each wafer carrier, and a wafer onto the wafer carrier;
- loading the wafer carrier, at the stocker station wafer carrier loading area, onto a transport vehicle;
- moving the transport vehicle along the multilevel track system to a designated processing station in response to the information contained in the process sequence stored in the information storage memory;
- unloading the wafer carrier at the designated processing station;
- performing a designated process at the designated processing station;
- altering the process sequence of the wafer carrier, to indicate the designated process step performed at the designated processing station has been completed;
- loading the wafer carrier onto one of the transport vehicles;
- moving the one transport vehicle to a next processing station in response to the altered process sequence in the wafer carrier;
- repeating the method steps contained in the process sequence until the process sequence steps in the wafer carrier are completed;
- moving the wafer carriers along the multilevel track system to the stocker station;
- and
- unloading the wafer carrier at the stocker station wafer carrier unloading area.
Dependencies are inferred from the claim text.