Method and apparatus for in-situ borehole stress determination
AssigneePhillips Petroleum Company
InventorDouglas W. Rhett
Life of this patent
Estimating the term…
Loading patent…
AssigneePhillips Petroleum Company
InventorDouglas W. Rhett
Estimating the term…
A borehole technique for in-situ determination of principal stresses operating in a plane normal to the borehole includes using a downhole jack to independently initiate three spaced apart fractures in a subterranean formation, measuring the breakdown pressure required to initiate the fractures and then using the measured breakdown pressures in two-dimensional axial transformation equations to compute the maximum and minimum stresses that are active in the normal plane. The technique is useful while drilling the borehole by lowering a jack having three platens that can be independently activated to bear against the borehole wall along three radii which are offset from each other about the borehole axis. In use each platen is extended in turn to bear against the borehole wall until a fracture is initiated.
A method for determining the stress condition of a subterranean formation traversed by a borehole, wherein the stress acts in a plane normal to said borehole at a depth corresponding to the depth of said formation, said method comprising the following steps:
A method for determining the stress condition of a subterranean formation while drilling a wellbore, wherein the stress is determined in a plane normal to said wellbore at a selected wellbore depth, said method comprising the following steps:
Apparatus for in-situ determination of a stress condition of a subterranean formation traversed by a borehole, wherein the stress acts in a plane normal to said borehole at a depth corresponding to the depth of said formation, said apparatus comprising:
Dependencies are inferred from the claim text.