Methods for sub-surface fluid shut-off
AssigneeChevron U.S.A. Inc.
InventorsClyde D. Wehunt, Jr., Bradley G. Gautreaux, Jeffrey P. Ortwein
Life of this patent
Estimating the term…
Loading patent…
AssigneeChevron U.S.A. Inc.
InventorsClyde D. Wehunt, Jr., Bradley G. Gautreaux, Jeffrey P. Ortwein
Estimating the term…
Methods for reducing or eliminating undesirable fluid-production in a producing well by releasing a plugging material below an obstruction placed in the producing zone. The obstruction is placed near the base of a desirable fluid-producing interval. The plugging material flows outward to form a barrier to the flow of undesirable fluids into the desirable fluid-producing interval. For most applications, a buoyant plugging material is used so that undesirable fluid crossflow carries the plugging material to the location where it is needed to form a barrier to the undesirable fluid production. The present invention can be used in gravel-packed wells, open hole wells, slotted-liner wells, monobore completion wells, or cased-hole wells. The present invention can also be used with a pair of obstructions with a plugging material released between them to shut off multiple intermediate intervals producing undesirable fluids. In some circumstances, the present invention can be used with a pair of obstructions without the need for a plugging material to be released between the obstructions. Likewise, the invention can be used in vertical, inclined, or horizontal wells.
A method for reducing the production of undesirable fluid from a well having a production zone, the production zone including an undesirable fluid-producing interval and a desirable fluid-producing interval, said method comprising:
A method for reducing the production of undesirable fluid from a well having a production zone, the production zone including an undesirable fluid-producing interval and a desirable fluid-producing interval, said method comprising:
A method for reducing the production of undesirable fluid from a well having a gravel-containing zone traversing a production zone having a perforated tubing surrounded by a first screen separated from a second screen by a blank area, and a third screen separated from the second screen by a blank area, the production zone having gravel around the first screen, the second screen, and the third screen, the production zone including an undesirable fluid-producing interval and at least one desirable fluid-producing interval, said method comprising:
Dependencies are inferred from the claim text.