Fuzzy logic adaptive defrost control
AssigneeWhirlpool Corporation
InventorsJoseph M. Szynal, Beth A. Maddix, Ronald W. Guess
Life of this patent
Estimating the term…
Loading patent…
AssigneeWhirlpool Corporation
InventorsJoseph M. Szynal, Beth A. Maddix, Ronald W. Guess
Estimating the term…
A defrost cycle controller for modifying the total length of time a compressor operates before a defrost cycle is initiated, wherein the time the compressor is on between defrost cycles is referred to herein as a frost accumulation period. A microprocessor includes means for deenergizing the compressor and coupling the defrost heater to a power supply when a continuous compressor run time exceeds a predetermined demand defrost time. The microprocessor further includes means for determining the time required to actually defrost the evaporator during a defrost operation, referred to herein as a defrost time, and means for modifying the frost accumulation period in response to the time to complete the defrost operation. The present invention further provides a method for determining the time required to actually defrost the evaporator during a first defrost operation, referred to herein as a first defrost time, and for determining the time required to actually defrost the unit during a second defrost operation, referred to herein as a second defrost time, wherein the second defrost operation is immediately subsequent to the first defrost operation. An inference is made as to whether the frost accumulating period should be modified before initiating the next defrost operation in response to the first defrost time and the second defrost time are provided and the frost accumulating period is modified if required.
A method of controlling the defrosting of a heat transfer unit of a temperature conditioning system by initiating a defrost operation when a predetermined amount of frost has accumulated on the unit during a frost accumulating period that occurs between defrost operations, a known desired defrost time period being required to defrost said unit when it has the predetermined amount of accumulated frost thereon, said method comprising the steps:
A method of controlling the defrosting of an evaporator in a refrigeration system, said system including a compressor and a defrost heater associated with the evaporator, a predetermined demand defrost time being known for limiting continuous compressor run times, the method comprising the steps of:
A defrost cycle controller for a refrigeration system, said system including a compressor, an evaporator and a defrost heater associated with the evaporator, said defrost cycle controller modifying the total length of time the compressor operates before a defrost cycle is initiated, wherein the cumulative time the compressor is energized between defrost cycles is referred to herein as a frost accumulation period, said defrost cycle controller comprising:
Dependencies are inferred from the claim text.