In a production planning system, the explosion of a product to parts is performed by a specification check device and a design passage judgement device. An MRP calculation control device, a leadtime forecasting device, an MRP explosion calculation device, a work load calculation device and a data input/output device cooperate to estimate a shop load and to calculate a leadtime with a work load and a production capacity taken into consideration, thereby drawing up a production plan. A problem area analysis device analyzes a problematical area in the production plan to display it by graphics of the data input/output device. Various adjustment devices carry out the adjustment of the production plan through a graphic interface.
A production planning system comprising a data input/output device having a data input/output display and operation processing function, a leadtime forecasting device for forecasting a leadtime from a production capacity and a work load, a material requirement planning (MRP) explosion calculation device for performing an MRP calculation from the leadtime and from data for performing an MRP explosion calculation and outputting a result of the MRP calculation, a work load calculation device for calculating a work load from the result of the MRP calculation, an MRP calculation control device for controlling operation of said leadtime forecasting device, said MRP explosion calculation device and said work load calculation device, a problem area analysis device for analyzing and outputting a problematical area from an output of said MRP explosion calculation device in accordance with an instruction from said data input/output device, a production capacity adjustment device for changing a production capacity in accordance with an instruction from said data input/output device to make an output instruction to said MRP explosion calculation device, and a data retention device, whereby a possibility of execution of a production plan is judged by making a production schedule simulation through a calculation of a leadtime with a work load and a production capacity of each process being taken into consideration.
A production plan adjusting system comprising:
Dependencies are inferred from the claim text.