Backspan stress joint
AssigneeShell Oil Company
InventorPeter W. Marshall
Life of this patent
Estimating the term…
Loading patent…
AssigneeShell Oil Company
InventorPeter W. Marshall
Estimating the term…
An improved support system is disclosed for providing flexibility to a restrained termination of a highly pressurized, highly tensioned tubular element which extends from a subsea facility to a compliant structure. The tubular element is provided with an intermediate tension relief connection which separates a running span from a backspan and operably connects the tubular element to a support structure, transfering thereto a significant portion of the tension carried by the tubular element. This connection passes angular rotation of the tubular element but resists lateral motion, in effect forming a node in the deflection of the tubular element. A backspan is thus created in the tubular element having a tension load which is reduced from that in the running span, thereby increasing the flexibility apparent at the end of the running span, while maintaining a relatively restrained termination of the tubular element at the distal end of the backspan. Another aspect of the present invention is a method for increasing the flexibility at a termination of a highly tensioned, pressurized tubular element connecting a subsea facility to a compliant structure.
An improved support system for providing flexibility to a restrained termination of a highly pressurized, highly tensioned tubular element in an offshore application extending from a subsea facility to a compliant structure, comprising:
An improved riser support system for supporting a riser from an offshore compliant structure, comprising:
An improved riser support system for supporting a riser from a support structure associated with an offshore compliant structure, the riser support system comprising:
A method for increasing riser flexibility at a riser termination for an offshore riser connecting subsea facilities to a compliant structure, the method comprising:
A method for increasing flexibility at a termination of a highly tensioned, pressurized tubular element deployed in a deepwater, offshore application to connect a subsea facility to a compliant structure, the method comprising:
Dependencies are inferred from the claim text.