Overburden removal method with blast casting and excavating apparatus
AssigneeAtlantic Richfield Company
InventorsRandall N. Evans, Monica S. Cummins, Marlyn G. King, Robert L. Ferguson
Life of this patent
Estimating the term…
Abstract
Coal and other mineral seams are uncovered of overburden to a predetermined width by blast casting a portion of the overburden into an adjacent spoil pit followed by fragmentation blasting of the remaining width of the overburden panel. A dragline excavator is moved at least partially onto the fragmented overburden for excavating a keycut portion together with excavation to level the bench for an adjacent overburden panel and placement of the material on a temporary spoil pile.
Claims6
A method for removing overburden from a mineral seam in the earth comprising the steps of:
- determining a seam width to be uncovered of said overburden material;
- predetermining a portion of said seam width covered by overburden to define an overburden panel which may be blast cast into a pit area adjacent to said seam;
- drilling a predetermined pattern of blastholes into said overburden to receive explosive charges and blast casting said overburden from over said predetermined portion of said seam width;
- drilling a predetermined pattern of substantially vertical blastholes in the remaining portion of said overburden over said seam width and blast fragmenting said remaining portion of said overburden by detonating explosive charges in said substantially vertical blastholes;
- and
- placing an excavating apparatus at least partially on said fragmented portion of said overburden and excavating overburden from above said seam.
A method for removing overburden from a coal seam in the earth, comprising the steps of:
- determining a portion of said seam having a width not less than about 250 feet;
- determining a first portion of said overburden over said portion of said seam having a width not greater than about 150 feet;
- drilling a first set of blastholes at an angle from the vertical in said first portion of said overburden and blast casting said first portion of said overburden toward a pit area adjacent said seam;
- drilling a second set of substantially vertical blastholes in a second portion of said overburden over said portion of said seam and blast fragmenting said second portion of said overburden;
- and
- placing a dragline excavator at least partially on said second portion of said overburden and excavating material from said second portion of said overburden to form a spoil pile.
Dependencies are inferred from the claim text.