Versatile production system and method of operating same
AssigneePfu Limited
InventorsNobuo Saka, Junichi Oda, Kazuyuki Kajihara, Yasuaki Ishiyama
Life of this patent
Estimating the term…
Loading patent…
AssigneePfu Limited
InventorsNobuo Saka, Junichi Oda, Kazuyuki Kajihara, Yasuaki Ishiyama
Estimating the term…
The present invention relates to a versatile production system and a method of operating same. The system generates a work order so as to improve production efficiency and minimize line balance loss. The system includes working places for assembling and testing various kinds of products and line terminals installed in the working places. A communication-memory unit is attached to a product or a pallet so as to match the flow of products and information. A line host controller stores files containing information related to work contents, operators, time changes, standard parts feeding sequence, components of a product and maintenance tool. The line host controller calculates and assigns work so as to reduce the inefficient use of time and outputs work orders via the line terminals. The system monitors parameters related to time control, quality conditions and the states of operators. The system rearranges work orders and stops the system if a critical fault occurs.
A versatile production system for assembling parts into a product and testing the product, the versatile production system providing work orders, which indicate work assignments, where system data relates to at least one of work order control, progress control, schedule arrangement and product history, and fault data relates to at least one of the existence of faulty parts, the repair of faulty parts and the replacement of faulty parts, the versatile production system comprising:
A versatile production system for assembling parts into a product and testing the product, the versatile production system providing test result reports and work orders, where test result reports indicate test data for a product that has been tested and work orders indicate work assignments which are assigned so as to reduce the inefficient use of time, system data relates to at least one of work order control, progress control, schedule arrangement and product history and line host controller data is data stored in the line host controller and relates to at least one of work contents, operators, time changes, standard parts feeding sequence, components of a product and maintenance tools, the versatile production system comprising: