Train traffic control system with diagram preparation
AssigneeMitsubishi Denki Kabushiki Kaisha
InventorsTatsuya Fukawa, Kenji Morihara
Life of this patent
Estimating the term…
Abstract
A train traffic control system which automatically prepares a shuttle service diagram based on a partial simulation of each train, at each station, etc., executed only by setting such initial data of the shuttle service as current states of trains in operation and possibility of service extension to other line, that is, other company line, a branch line or the like, when the shuttle service is required in a limited train section due to railroad accident or the like during the traffic control by a normal diagram, and controls the train route according to the shuttle service diagram.
Claims5
A train traffic control, comprising:
- an input device for inputting current data of trains in operation as initial data of a shuttle service at the time of changing the train operation to the shuttle service;
- a file for storing predetermined decision rules including the propriety of approach and departure of the train at each station;
- a simulation means for estimating arrival and departure times of the train by a partial simulation in use of the initial data of the shuttle service at each station within a route operated by the shuttle service:
- means for deciding arrival and departure times of the train at each station according to the simulation result and to the decision rules;
- a diagram preparing means for preparing a shuttle service diagram according to the decision result;
- a central processing unit for transmitting the shuttle service diagram to each station;
- and
- a station control device for controlling train routes at the station according to the transmitted shuttle service diagram;
- wherein said diagram preparing means comprises:
- means for judging for each train one of a current stopping station and a position between stations based upon on-track data;
- means for determining whether a train is between two turn-back stations which surround a location of service interruption;
- means for stopping a first train between said turn-back stations at a station nearest to said first train within a preparation time of said shuttle diagram, and for stopping said first train at its current location if said first train cannot be stopped at said nearest station within said preparation time;
- and
- means for setting a state of a second train located outside said two turn-back stations from one of a stopping station or a position between stations other than said turn-back stations.
A train traffic control system, comprising:
- an input device for inputting current data of trains in operation as initial data of a shuttle service at the time of changing the train operation to the shuttle service;
- a file for storing predetermined decision rules including the propriety of approach and departure of the train at each station;
- a simulation means for estimating arrival and departure times of the train by a partial simulation in use of the initial data of the shuttle service at each station within a route operated by the shuttle service;
- means for deciding arrival and departure times of the train at each station according to the simulation result and to the decision rules;
- a diagram preparing means for preparing a shuttle service diagram according to the decision result;
- a central processing unit for transmitting the shuttle service diagram to each station;
- and
- a station control device for controlling train routes at the station according to the transmitted shuttle service diagram;
- wherein said diagram preparing means comprises:
- means for searching diagrams of trains in operation outside of two turn-back stations which surround an area of service interruption;
- means. for changing destinations of said trains in operation to one of said turn-back stations or an end station;
- and
- means for changing a departure time of said trains in operation to an operational start time of said shuttle diagram.
A train traffic control system, comprising:
- an input device for inputting current data of trains in operation as initial data of a shuttle service at the time of changing the train operation to the shuttle service;
- a file for storing predetermined decision rules including the propriety of approach and departure of the train at each station;
- a simulation means for estimating arrival and departure times of the train by a partial simulation in use of the initial data of the shuttle service at each station within a route operated by the shuttle service;
- means for deciding arrival and departure times of the train at each station according to the simulation result and to the decision rules;
- a diagram preparing means for preparing a shuttle service diagram according to the decision result;
- a central processing unit for, transmitting the shuttle service diagram to each station;
- and
- a station control device for controlling train routes at the station according to the transmitted shuttle service diagram;
- wherein said diagram preparing means comprises:
- means for determining a first train among trains running in a same direction, said simulation means simulating arrival times at stations for said first train;
- means for preparing a diagram for a station arrived at by said first train if said arrival times are within a period of operation of said shuttle diagram;
- and
- means for determining whether a station arrived at by said first train after an end time of said shuttle diagram is a destination of said first train and if not, said simulation means simulates said first train to an end station of said first train.
Dependencies are inferred from the claim text.