# US 5,341,876 A · Below fracture pressure pulsed gel injection method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 5,341,876 A
- Document ID: US5341876A
- Status: Granted
- Kind: A
- Application number: 08/059,149
- Filed: 1993-05-10
- Granted: 1994-08-30
- Earliest claimed: 1993-05-10
- Assignees: Mobil Oil Corporation
- Inventors: James L. Burns; Bryan J. Dicus; Jayanthi K. Jasti; Jerry J. Kendall; Jose L. Olmos; Luis G. Zambrano
- Web page: https://patentgrep.com/patent/US5341876A

## CPC

- C09K 8/508: macromolecular compounds {(C09K8/512 takes precedence)}
- E21B 33/138: Plastering the borehole wall; Injecting into the formation
- E21B 43/26: by forming crevices or fractures
- C09K: MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A method for the injection of a pre-determined volume of gel below a fracture pressure limit is described. The fracture pressure limit for an unfractured formation is the fracture initiation pressure. The pressure limit for a previously fractured formation is the fracture extension pressure. Initially, a desired gel is injected into a thief zone at a constant rate while maintaining the injection pressure below the limiting fracture pressure. When the injection pressure reaches the formation fracture pressure limit, gel injection is halted for a period of about 3 hours. Afterwards, the bottom hole pressure is allowed to decline and stabilize. Next, gel injection is resumed at the same rate and pressure used prior to halting the injection. If necessary gel injection can be halted when the formation's pressure limit is again reached. After a period of about 3 hours, injection of gel can be again commenced. These steps can be repeated until a pre-determined volume of gel has been placed into the thief zone.

## Claims

### Claim 1

A method for injecting a predetermined volume of gel into a thief zone comprising:
(a) injecting a solidifiable gel mixture into a high permeability or thief zone at a constant rate until the formation fracture pressure limit is reached;
(b) ceasing injection of the gel into the thief zone once the formation fracture pressure limit has been reached but not exceeded for a time sufficient to cause the wellbore or borehole bottom pressure to decline and stabilize; and
(c) injecting thereafter the gel into said thief zone for a time sufficient to cause the predetermined volume of gel to be placed into said thief zone.

### Claim 2 (depends on 1)

The method as recited in claim 1 where steps (a), (b), and (c) are repeated if necessary to obtain a placement of a predetermined volume of gel into a thief zone.

### Claim 3 (depends on 1)

The method as recited in claim 1 wherein step (b) gel injection is ceased or halted for a period of 1 to about 3 hours.

### Claim 4 (depends on 1)

The method as recited in claim 1 where the gel forms a solid gel in about 3 to about 19 hours.

### Claim 5 (depends on 1)

The method as recited in claim 1 where an enhanced oil recovery method is instituted into a lower permeability zone after the thief zone has been closed and a solid gel formed therein.