Technique and apparatus for selective multi-zone vertical and/or horizontal completions
AssigneeNatural Reserves Group, Inc.
InventorStephen A. Graham
Life of this patent
Estimating the term…
Loading patent…
AssigneeNatural Reserves Group, Inc.
InventorStephen A. Graham
Estimating the term…
A vertical cased well penetrates two or more hydrocarbon bearing formations. A deviated well includes a horizontal drain hole extending a substantial distance into at least one of the formations. A production string is cemented in the horizontal drain hole and is cut off inside the vertical cased well. Perforations through the vertical cased well communicate the well with some or all of the formations. A production assembly in the vertical cased well includes a series of external casing packers isolating the hydrocarbon bearing formations. Wire wrapped port collars between the external casing packers controls flow into the production assembly and upwardly through the well. A resin coated sand may be plated in the annulus between the production assembly and the vertical casing to control the production of formation solids. The external casing packers straddling the entry of the horizontal drain hole into the vertical well may be provided with a bypass to allow the resin coated sand to overflow into the annulus above the production assembly.
A hydrocarbon producing well comprising
A hydrocarbon producing well comprising
A production liner assembly for running into a well comprising
An openable flow control apparatus for use in a subterranean well having a production zone and containing fluid in the well, comprising
The process of completing a well comprising the steps of providing a vertical well penetrating a hydrocarbon bearing formation, drilling a deviated well bore away from the vertical well through an opening therein and providing a more-or-less horizontal well bore section extending into the hydrocarbon bearing formation, running a production liner assembly into the vertical well including a conduit having a pair of packers straddling the opening and at least one flow control device between the packers, sealing the packers against the cased well, and pumping a permeable sand control material downwardly through the production liner assembly, upwardly around the production liner assembly and upwardly through a bypass around the packers into the vertical well above the packers.
The process of completing a well comprising the steps of providing a vertical well penetrating at least one hydrocarbon bearing formation, establishing a first completion and providing communication between the vertical well and the formation by drilling a deviated well bore away from the vertical well through an opening and providing a well bore extending into the formation, establishing a second completion between the vertical well and the formation, running into the vertical a production liner assembly including a conduit having a pair of first casing packers straddling the deviated well bore opening and at least one openable flow control device between the packers, a pair of second casing packers straddling the second completion and at least one openable flow control device between the packers, and sealing the packers against the vertical well.
An openable flow control apparatus for use in a subterranean well having a production zone and containing fluid in the well, comprising
Dependencies are inferred from the claim text.