Lift trucks and extensible mast structures therefor
AssigneeLinde Aktiengesellschaft
InventorBarry M. Warner
Life of this patent
Estimating the term…
Loading patent…
AssigneeLinde Aktiengesellschaft
InventorBarry M. Warner
Estimating the term…
An extensible mast structure having a fixed mast section and at least one movable mast section mounted on the fixed mast section. A load carrying carriage mounted on the movable mast section for vertical movement relative to the movable mast section. A primary jack connected to the movable mast section for moving the load carrying carriage and a secondary jack connected to the fixed mast section for moving the movable mast section to extend the mast structure. The relative operational cross-sectional areas of the primary jack and the secondary jack are selected to sequence movement of the primary jack to move the load carrying carriage before the secondary jack moves the movable mast section. A stop on the fixed mast section to engage a stop on the primary jack at an intermediate point in the stroke of the primary jack which permits the primary jack to assist the secondary jack and move the movable mast section during the remainder of its stroke while continuing to move the load carrying carriage and the secondary jack continues its stroke so that movement of the movable mast section is substantially uninterrupted.
An extensible mast structure for a lift truck comprising a fixed mast section, at least one movable mast section mounted on said fixed mast section for vertical movement relative to said fixed mast section and a load carrying carriage mounted on said at least one movable mast section for vertical movement relative to said at least one movable mast section, a primary jack including a movable part, means operatively connecting said movable part to said load carrying carriage for moving said load carrying carriage relative to said movable mast section, a secondary jack connected to said fixed mast section and to said at least one movable mast section for moving said at least one movable mast section relative to said fixed mast section to extend said extensible mast structure, said primary jack and said secondary jack having relative operational cross-sectional areas selected to sequence the stroke of said primary jack to raise said load carrying carriage before the beginning of the stroke of said secondary jack to move said at least one movable mast section to extend said extensible mast structure, stop means on said fixed mast section and means carried by said movable part of said primary jack for engaging said stop means on said fixed mast section at an intermediate point in the stroke of said primary jack to thereby enable said primary jack to assist said secondary jack to move said at least one movable mast section to extend said extensible mast structure during the remainder of the stroke of said primary jack while continuing to raise said load carrying carriage relative to said at least one movable mast section, and said secondary jack continues its stroke to extend said extensible mast structure;
A method of controlling the movement of an extensible mast structure for a lift truck, said mast structure including a fixed mast section, at least one movable mast section mounted on said fixed mast section and a load carrying carriage movable along said movable mast section, a primary jack for moving said load carrying carriage relative to said at least one movable mast section and a secondary jack for moving said movable mast section relative to said fixed mast section to extend said extensible mast structure, said two jacks having operational cross-sectional areas selected to sequence the operation of said primary jack to move said load carrying carriage before the movement of said secondary jack to extend said extensible mast structure, said method comprising initiating the stroke of said primary jack to move said load carrying carriage relative to said movable mast section, initiating the stroke of said secondary jack to move said movable mast section relative to said fixed mast section to extend said extensible mast structure before the completion of said stroke of said primary jack to move said at least one movable mast section relative to said fixed mast section to extend said extensible mast structure, and thereafter completing said stroke of said primary jack to assist the stroke of said secondary jack to move said movable mast section relative to said fixed mast section to extend said extensible mast structure while simultaneously continuing to move said load lifting carriage relative to said extensible mast structure during the completion of said stroke of said primary jack to provide substantially uninterrupted movement of said at least one movable mast section relative to said fixed mast section during the extension of said extensionable mast structure.
Dependencies are inferred from the claim text.