Method of preventing gas migration during primary well cementing
AssigneeHalliburton Company
InventorsFred L. Sabins, David L. Sutton
Life of this patent
Estimating the term…
Loading patent…
AssigneeHalliburton Company
InventorsFred L. Sabins, David L. Sutton
Estimating the term…
The present invention provides a method of preventing gas migration during primary well cementing. The method basically comprises the steps of displacing a cement slurry into the annulus between a string of pipe to be cemented in a well bore and the walls of the well bore, determining the initial surface pressure in the pipe after the cement slurry is placed in the annulus, displacing additional cement slurry into the annulus as is necessary to make up for losses in the surface pressure due to cement slurry gel strength development and volume reduction whereby the surface pressure is maintained substantially equal to the initial surface pressure until the cement slurry develops a predetermined gel strength sufficient by itself to prevent gas migration, and then allowing the cement slurry to set into a hard impermeable mass in the annulus.
A method of cementing a string of pipe in a well bore which penetrates a gas formation while preventing gas migration in the well bore, both the pipe and well bore being substantially filled with drilling fluid, comprising the steps of:
A method of cementing a string of pipe in a well bore which penetrates a gas formation while preventing gas migration in the well bore, both the pipe and well bore being substantially filled with drilling fluid, comprising the steps of:
A method of cementing a string of pipe having a float shoe at the bottom end thereof in a well bore which penetrates a gas formation while preventing gas migration in the well bore, both the pipe and well bore being substantially filled with drilling fluid, comprising the steps of:
Dependencies are inferred from the claim text.