Well control system
AssigneeOtis Engineering Corporation
InventorsWilliam G. Boyle, John J. Goiffon, Charles M. Pool
Life of this patent
Estimating the term…
Loading patent…
AssigneeOtis Engineering Corporation
InventorsWilliam G. Boyle, John J. Goiffon, Charles M. Pool
Estimating the term…
An electrically actuated downhole system for controlling and monitoring the flow of gas from a gas lift petroleum well in which a borehole penetrates at least two spacially separated geological production zones, and at least two strings of parallel tubing extend along the interior of a well casing, each string being associated with a separate production zone. Connected to each string is a gas lift valve associated with the string's respective spacially separated production zone. A single source of pressurized gas is connected to the casing at the wellhead to provide a source of lift gas. A control unit located at the surface independently controls and monitors the size of the flow control aperture of each gas lift valve to control the production of fluids from each separate production zone. Control cables carry readings from downhole pressure and flow-rate sensors to the control unit, and in response, carry control signals back to each gas lift valve to control its aperture size.
A system for controlling the flow from a gas lift petroleum production well in which a borehole penetrates at least two spacially separated geological production zones and includes a casing extending from a wellhead to line the borehole and extend into both of said spacially separated production zones and at least two strings of tubing extending in parallel along the interior of the casing from the wellhead and wherein the first string of tubing extends into the region of the first of said spacially separated production zones and the second string of tubing extends into the region of the second of said production zones, said system comprising:
A system for controlling the flow from a gas lift petroleum production well in which a borehole penetrates at least two spacially separated geological production zones and includes a casing extending from a wellhead to line the borehole and extend into both of said spacially separated production zones and at least two strings of tubing extending in parallel along the interior of the casing from the wellhead and wherein the first string of tubing extends into the region of the first of said spacially separated production zones and the second string of tubing extends into the region of the second of said production zones, said system comprising:
A method for controlling the flow from a gas lift petroleum production well in which a borehole penetrates at least two spacially separated geological production zones and includes providing a casing extending from a wellhead to line the borehole and extend into both of said spacially separated production zones and at least two strings of tubing extending in parallel along the interior of the casing from the wellhead and wherein the first string of tubing extends into the region of a first of said spacially separated production zones and the second string of tubing extends into the region of the second of said production zones, said method comprising:
A method for controlling the flow from a gas lift petroleum production well in which a borehole penetrates at least two spacially separated geological production zones and includes providing a casing extending from a wellhead to line the borehole and extend into both of said spacially separated production zones and at least two strings of tubing extending in parallel along the interior of the casing from the wellhead and wherein the first string of tubing extends into the region of a first of said spacially separated production zones and the second string of tubing extends into the region of the second of said production zones, said method comprising:
A system for controlling the flow from a gas lift petroleum production well which includes a casing extending from a wellhead to line the borehole and extend into a production zone and a string of tubing extending along the interior of the casing from the wellhead into the region of said production zone, said system comprising:
A method for controlling the flow from a gas lift petroleum production well which includes a casing extending from a wellhead to line the borehole and extend into a production zone and a string of tubing extending along the interior of the casing from the wellhead into the region of said production zone, said method comprising:
In a system for monitoring downhole variable parameters within a petroleum production well, comprising:
A system for monitoring and controlling downhole parameters within a petroleum production well comprising:
A system for monitoring and controlling downhole parameters within a petroleum production well comprising:
A system for monitoring and controlling downhole parameters within a petroleum production well comprising:
A system for monitoring and controlling downhole parameters within a petroleum production well comprising:
A system for monitoring and controlling downhole parameters within a petroleum production well comprising:
Dependencies are inferred from the claim text.