Determination of well pumping system downtime
AssigneeDelta-X Corporation
InventorsFount E. McKee, Douglas M. Crume
Life of this patent
Estimating the term…
Abstract
In a liquid well pumping system which is provided with a downtime between pumpoff cycles, the method of determining the maximum downtime includes running a plurality of tests to determine the relationship between runtime and downtime and determining when the relationship becomes non-linear for at least two consecutive tests. The downtime is selected adjacent the last linear relationship between runtime and downtime for providing a downtime which allows adequate fluid buildup in the well, but not so long a period as to loose well production.
Claims11
In a liquid well pumping system which is provided with a downtime between pumpoff cycles, the method of determining the optimum downtime comprising,
- providing a first downtime for a predetermined amount of time,
- running the pump until pumpoff occurs while measuring the runtime,
- continuing, for a plurality of tests, the last two steps, while increasing the downtime for each test,
- determining when the relationship between runtime and downtime becomes non-linear, and
- selecting a downtime before the non-linearly relationship.
In a liquid well pumping system, which is provided with a downtime between pumpoff cycles, the method of determining the maximum downtime comprising,
- pumping the well until pumpoff occurs, providing a first downtime for a predetermined amount of time,
- again running the pump until pumpoff occurs while measuring the runtime,
- providing a second downtime for an additional predetermined amount of time,
- again running the pump until pumpoff occurs while measuring the runtime,
- continuing the last two steps while increasing the downtime by the predetermined amount of time for each test for a plurality of tests,
- determining the average runtime for the first N measurements of runtime,
- determining the runtime for the N+1 test and comparing the runtime to the average runtime,
- if the runtime N+1 is equal or greater than the average runtime, then determining the average runtime of the N+1 tests, and then determining the runtime for the N+2 test and comparing to the average runtime of the N+1 tests,
- when the runtime of any test is less than the average of the runtime for the preceding tests for at least three tests, selecting the optimum downtime as the downtime at the last test which occurred before the decrease in runtime compared to the preceding average.
Dependencies are inferred from the claim text.