Apparatus and method for continuously removing existing reinforced pavement and simultaneously replacing the same by a new pavement
OwnerGeorge L. Gorski, Donald D. Zamzowinventors
Life of this patent
Estimating the term…
Loading patent…
OwnerGeorge L. Gorski, Donald D. Zamzowinventors
Estimating the term…
A mobile pavement replacement system (MPRS) is provided for forcibly drawing a flexibly-supported, acute-angled wedge under an existing stretch of a predetermined width of reinforced pavement to initiate removal thereof from the ground below. Gravity-assisted impact hammers apply downward blows of a controlled magnitude and at a predetermined rate onto an upper surface of the reinforced pavement, to crack the same across the entire width thereof over the wedge being driven therebelow. The wedge is flexibly supported, with a predetermined amount of elasticity in the up-and-down direction, so that it essentially "floats" and facilitates absorption of the impact forces by the reinforced pavement to be cracked thereby. Cracked reinforced pavement is subjected to further blows by a hammer coacting with a set of bars transverse thereto, to forcibly render a bulk component of the reinforced pavement into small pieces separated from reinforcement material contained therein. The reinforcement material, is now separated from the bulk component, chopped up and delivered in a flow separate from that of the rendered bulk component. The rendered materials are selectively combined with other suitable materials and integrated into a replacement pavement continuously laid in the wake of the moving MPRS.
A mobile pavement replacement system for advancing at a user-controlled rate on an existing layer of reinforced pavement to continuously remove the same to separate a bulk component thereof from a reinforcement component present therein and to deliver the same separately in rendered form, comprising:
A method for continuously replacing pavement by breaking up and removing existing reinforced pavement, simultaneously separating a bulk component thereof from a reinforcement component and delivering small pieces thereof in two separate flows for utilization of the recovered bulk component pieces in forming the replacement pavement, comprising the steps of:
Dependencies are inferred from the claim text.