Cemented carbide drill
AssigneeSumitomo Electric Industries, Ltd.
InventorsToshio Nomura, Nobuyuki Kitagawa, Kazutaka Isobe
Life of this patent
Estimating the term…
Abstract
A drill is formed by a hard dispersed phase of WC and a B-1 type solid solution, and a bond metal phase of an iron family metal. The composition of the hard dispersed phase is expressed as (W.sub.a M.sub.b) (C.sub.x N.sub.y), where M represents Ti, or two or more metals, including Ti but excluding W, selected from the group IVa, Va and VIa of the periodic table, and a, b, x and y represents molar fractions which are defined by relational expressions of a+b=1, x+y=1, x>0, y.gtoreq.0 and b.gtoreq.0.4. The bond metal phase occupies at least 13 volume percent and not more than 30 volume percent of the cemented carbide.
Claims8
A cemented carbide drill formed by a hard dispersed phase consisting of WC and a B-1 type solid solution and a bond metal phase of an iron family metal,
- said hard dispersed phase being composed of (W.sub.a M.sub.b)(C.sub.x N.sub.y), where M represents Ti, or two or more metals, including Ti but excluding W, selected from the groups IVa, Va and VIa of the periodic table, and a, b, x and y represent such molar fractions that a+b=1, x+y=1, x>0, y.gtoreq.0 and b.gtoreq.0.4,
- said bond metal phase occupying at least 13 volume percent and not more than 30 volume percent of said cemented carbide.
A cemented carbide drill comprising a cutting edge portion for cutting workpieces and a shank portion to be mounted on a prescribed position of a cutting machine,
- said cutting edge portion being prepared from first cemented carbide consisting of a first hard dispersed phase of WC and a B-1 type solid solution and a first bond metal phase of an iron family metal,
- said first hard dispersed phase being composed of (W.sub.a M.sub.b)(C.sub.x N.sub.y), where M represents Ti, or two or more metals, including Ti but excluding W, selected from the group IVa, Va and VIa of the periodic table, and a, b, x and y represent such molar fractions that a+b=1, x+y=1, x>0, y.gtoreq.0 and b.gtoreq.0.4,
- said first bond metal phase occupying at least 13 volume percent and not more than 30 volume percent of said first cemented carbide,
- said shank portion being integrally joined with said cutting edge portion and prepared from second cemented carbide consisting of a second hard dispersed phase of WC particles and a second bond metal phase containing Co, said second hard dispersed phase being not more than 0.7 .mu.m in average particle size, said second bond metal phase occupying at least 13 volume percent and not more than 30 volume percent of said second cemented carbide.
Dependencies are inferred from the claim text.