Dual fuel heat pump controller
AssigneeElectric Power Research Institute, Inc.
InventorsAnoop Mathur, Wendy K. Foslien
Life of this patent
Estimating the term…
Loading patent…
AssigneeElectric Power Research Institute, Inc.
InventorsAnoop Mathur, Wendy K. Foslien
Estimating the term…
An operating system for a dual fuel heating system having first and second heat pump stages, first and second gas furnace stages, an executive controller for tracking time increments and call control strategies at appropriate levels, a demand control for calculating the amount of time each heat pump can be on during a predetermined time window, a data storage apparatus, a thermostat, a first predicting module for predicting non-heat pump electrical load based on a moving average, a second predicting module for predicting heat load based on a moving average, and a limiting module for setting demand limits for off-peak, mid-peak and peak periods. The executive controller is operated to initiate operation of the foregoing routines to determine, based on historical building profile information including non-heat pump electric power information the availability of heat pump power with no increase in demand charges during any given incremental interval. In a further aspect of the invention, break even points are calculated to determine the economic feasibility of increasing the demand set point incrementally in a dual fuel system. The system integrates intelligent demand logic and conventional thermostat logic algorithms into a dual fuel control system.
An operating method for a dual fuel heating system having an energy profile including a demand set point, first and second heat pump stages, first and second gas furnace stages, an executive controller for tracking time increments and implementing call control strategies at appropriate intervals, a demand control for calculating the amount of time each heat pump can be on during a predetermined time window, a data storage means, a thermostat means, first predicting means for predicting non-heat pump electrical load based on a moving average, second predicting means for predicting heat load based on a moving average, limiting means for setting demand limits for off-peak, mid-peak and peak periods wherein the operating method comprises the steps of:
An operating method for a dual fuel heating system having an energy profile including a demand set point, first and second heat pump stages, first and second gas furnace stages, an executive controller for tracking time increments and implementing call control strategies at appropriate intervals, a demand control for calculating the amount of time each heat pump can be on during a predetermined time window, a data storage means, a thermostat means, first predicting means for predicting non-heat pump electrical load based on a moving average, second predicting means for predicting heat load based on a moving average, limiting means for setting demand limits for off-peak, mid-peak and peak periods wherein the operating method comprises the steps of:
Dependencies are inferred from the claim text.