Process for making a tunnel and advancing a tunneling read with a wall-supporting shield
AssigneeHochtief Aktiengesellschaft Vorm. Gebr. Helfmann
InventorSiegmund Babendererde
Life of this patent
Estimating the term…
Loading patent…
AssigneeHochtief Aktiengesellschaft Vorm. Gebr. Helfmann
InventorSiegmund Babendererde
Estimating the term…
In my process for digging a tunnel with the help of a tunnel excavator which has a working chamber under atmospheric pressure, the local front wall is supported with the help of a pressurized medium which is connected by a controlling gap of a shield cover with another gap between a shield cover tail and/or the earth or ground and a tunnel-lining member. The gap is closed-off from the working chamber by a gap-sealing ring between a shield cover tail and a tunnel-lining member. Concrete is forced into the gap by a feeder pipe in the gap-sealing ring. A self-sealing permeable joint between the gap-sealing ring and the shield cover tail and/or the tunnel-lining member of the excavator is made with concrete which has a fine-grained additive material and a large-grained additive material so that the large-grained additive material forms a grain filter whose pores are closable by the fine-grained additive material.
A method of forming a tunnel, comprising the steps of:
Dependencies are inferred from the claim text.