Drain channel alignment and installation apparatus
OwnerThomas B. Beattie, Fred M. Schweinberg +1inventors
InventorsThomas B. Beattie, Fred M. Schweinberg, Ronald L. Rutzen
Life of this patent
Estimating the term…
Loading patent…
OwnerThomas B. Beattie, Fred M. Schweinberg +1inventors
InventorsThomas B. Beattie, Fred M. Schweinberg, Ronald L. Rutzen
Estimating the term…
An alignment and installation strap for a presloped drainage channel run is disclosed wherein the strap includes a body and two arms perpendicular to said body, a spike attachment means on each arm and at least two thread holes with bolts on each arm, the holes being placed so that when the strap is placed over or under two adjacent drainage channel sections one of the bolts on each arm will screw into an indentation on each outside wall of one channel section and the other bolt on each arm will screw into an indentation on each outside wall of the second channel section when the two sections are correctly aligned and the two spike attachment means will accept, slide over and attach to two spikes which may be driven into the ground.
A strap for installing and aligning a drainage channel comprised of two or more drainage channel sections locatable in a trench, each drainage channel section having spaced-apart walls with inner and outer wall surfaces, a bottom with inner and outer wall surfaces, the inner wall and bottom surfaces forming a U-shaped channel with a top opening and at least one end opening, the end opening of a first section made so as to operatively engage with the end opening of a second section and each channel section having at least one alignment anchor indentation on the outside surface of each wall near the end opening, wherein said strap comprises a body with two arms attached to the body, the combination of the body and the arms essentially forming a U, the distance between the arms being slightly larger than the distance between the outside surface of the drainage channel walls, each arm having a spike attachment means for accepting, sliding over and attaching to a spike and at least two threaded channel holes with channel indentation bolts therein, the threaded channel holes being positioned on the arm so that when the strap is placed over the channel top opening or under the channel bottom at the joint between two drainage channel sections, with the arms extending over the outer surface of the channel walls, at least one threaded channel hole is positioned over the alignment anchor indentation of the first channel section and at least a second threaded channel hole is positioned over the alignment anchor indentation of the second channel section when the two channel section end openings are joined and aligned.
In drainage channel section used to form a drainage channel run having a predetermined slope where the run is comprised of two or more drainage channel sections in a trench and the drainage channel section is comprised of two spaced-apart walls with inner and outer wall surfaces, a bottom with inner and outer wall surfaces, the inner wall and bottom surfaces forming a U-shaped channel with a top opening and at least one end opening, the end opening of a first section made so as to operatively engage with the end opening of a second section the improvement which comprises drainage channel sections having at least one alignment anchor indentation on the outside surface of each wall near the end opening, placed so as to cooperate with an alignment anchor strap which comprises a body with two arms attached to the body the combination of the body and the arms essentially forming a U, the distance between the arms being slightly larger than the distance between the outside surface of the drainage channel walls, each arm having a spike attachment means for accepting, sliding over and attaching to a spike and at least two threaded channel holes with at least two channel indentation bolts therein, the threaded channel holes being positioned on the ar so that when the strap is placed over the channel top opening or under the channel bottom at the joint between two drainage channel sections with the arms extending over the outer surface of the channel walls, at least one threaded channel hole is positioned over at least one of the alignment anchor indentations of the first channel section and at least a second threaded channel hole is positioned over the alignment anchor indentation of the second channel section when two channel sections end openings are joined and aligned.
Dependencies are inferred from the claim text.