Method of operating a once-through steam generator
AssigneeSiemens Aktiengesellschaft
InventorEberhard Wittchow
Life of this patent
Estimating the term…
Loading patent…
AssigneeSiemens Aktiengesellschaft
InventorEberhard Wittchow
Estimating the term…
A method of operating a once-through steam generator having a first evaporator heating surface formed of a tube wall of a combustion chamber, and a second evaporator heating surface connected in parallel to the first evaporator heating surface at a water inlet side thereof, the second evaporator heating surface being located in a convection chamber post-connected to the combustion chamber at a flue-gas outlet side thereof downstream from a superheating surface as viewed in a flow direction of flue gas, includes opening a water regulating valve preconnected to the second evaporator heating surface in the flow direction of the feedwater, if a predetermined value of a mass flow of the feedwater into the once-through stem generator is exceeded, so as to initiate a partial mass flow of the feedwater into the second evaporator heating surface; and closing the water regulating valve again, if the predetermined value fails to be attained, so as to terminate the partial mass flow of the feedwater into the second evaporator heating surface.
A method of operating a once-through steam generator having a first evaporator heating surface formed of a tube wall of a combustion chamber, and a second evaporator heating surface connected in parallel to the first evaporator heating surface at a water inlet side thereof, the second evaporator heating surface being located in a convection chamber post-connected to the combustion chamber at a flue-gas outlet side thereof downstream from a superheating surface as viewed in a flow direction of flue gas, which comprises opening a water regulating valve preconnected to the second evaporator heating surface in the flow direction of the feedwater, if a predetermined value of a mass flow of the feedwater into the once-through steam generator is exceeded, so as to initiate a partial mass flow of the feedwater into the second evaporator heating surface;
Dependencies are inferred from the claim text.